Completing Enhanced Cx Templates for Federal Projects

NC-2009 EAc3: Enhanced Commissioning
posted by Hsin-Yi Hsieh on Jan 19, 2012, 10:33 am

Many federal projects are design/build (DB) where the DB firm hires the Commissioning Authority (...

Last reply: jason schneider, Jan 31, 2012, 1:43 pm

time green cleaning needs to be in place

EBOM-2009 IEQp3: Green Cleaning Policy
posted by Gita Nandan on Jan 24, 2012, 4:42 pm

I am wondering if we are applying this credit as an innovation credit for a NC project, if it needs to be in place before the tenants have moved in, or is there a window of time within which it...

Last reply: Steve Loppnow, Jan 30, 2012, 6:58 pm

Subdivivided, Previously Developed Land

General forums
posted by Sam Watters on Jan 30, 2012, 1:11 pm

Our project sits on a lot that was subdivided out from a larger parcel in the past. The original, combined lot, was about 50% paved and has two buildings on it, and continues to be used as a car...

Last reply: Eliot Allen, Jan 30, 2012, 1:33 pm

Form Now Available for Non-US Project Feedback on ACPs

General forums
posted by Deon Glaser on Jan 30, 2012, 10:19 am

Hello everyone! As promised, we finally have feedback forms for the LEED 2009 ACPs for Projects Outside the U.S. available for you on the USGBC website. LEED is built on the input and feedback we...

M&V case 2: System required to be monitored not installed

CI-2009 EAc3: Measurement and Verification
posted by Edwin Wealend on Jun 7, 2010, 10:14 pm

Hi,

We have a project where we are converting a warehouse into an office, it will have a site area > 75% of the building area, infact the whole...

Last reply: Luis Miguel Diazgranados, Jan 30, 2012, 10:18 am

Complying with Natural Ventilation Req. in a Apartment Bldg.

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Rob Hink on Jan 16, 2012, 9:25 am

We have a multi unit high rise residential bldg. and we are attempting to provide natural ventilation to all units using the operable windows and sliding doors. We have confirmed the amount of...

Last reply: Sustainability Provider, Jan 28, 2012, 3:41 am

Annual Rainfall Volume Calculation

NC-2009 SSc6.2: Stormwater design - quality control
posted by Jeremy Knoll on Jan 17, 2011, 3:54 pm

The civil engineer on my project is having trouble finding a source for exactly how the annual rainfall volume is supposed to be calculated. Can anyone point me (us) to an example or resource...

Last reply: Emily Catacchio, Jan 27, 2012, 8:14 pm

Is Reused Wood Flooring Required to be Certified?

CI-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Nina Tallering on May 26, 2011, 9:04 pm

Is reclaimed...

Last reply: Lauren Sparandara, Jan 27, 2012, 3:40 pm

LEED CI 2009 states: Project

CI-2009 EAc1.1: Optimize energy performance - lighting power
posted by Michelle Bracewell-Musson on May 4, 2011, 6:11 pm

mention "EAc2...option 1" you actually mean EAp2, in LEED-NC. This forum covers LEED-CI, EAc1.1. In any case, as your question refers to EAp2, your energy model will be based on Title 24-2005,...

Last reply: Dan LeBlanc, Jan 27, 2012, 3:39 pm

CALGreen Light Pollution Bulletin

NC-2009 SSc8: Light Pollution Reduction
posted by Lauren Sparandara on Jan 27, 2012, 3:36 pm

This note is for CALGreen but thought I'd share anyway.

The Light Pollution credit under CALGreen is now considered voluntary until July 1st. Also, the credit has been changed...