Pressure Drop Adjustment when no HVAC has been designedCS-2009 EAp2: Minimum Energy Performanceposted by Santiago Rodriguez on Feb 10, 2012, 6:40 am
Dear Forum, I am modeling a building which has no heating or cooling system in the design, so, according to Appendix G, I have modeled these systems exactly the same as in the baseline... Last reply: Marcus Sheffer, Feb 14, 2012, 10:09 am |
|
Addition to Hospital with Shared HW and CHW PlantNC-2009 EAc1: Optimize Energy Performanceposted by David Weigel, PE on Feb 8, 2012, 5:08 pm
I am working on a large (250,000 square-foot) addition to a 250,000 square-foot building, both are mixed-use but primarily hospital. We are simulating the addition as a separate building,... Last reply: Marcus Sheffer, Feb 14, 2012, 9:58 am |
|
Ashrae 90.1- Tradable SurfacesCS-2009 EAp2: Minimum Energy Performanceposted by Angela Saggin on Feb 10, 2012, 8:55 am
Hi! We have some canopies in our project, but one of these canopies is 5w over-lighted. It's our understanding that we can make it up by under-lighting other tradable surface. Can... Last reply: Marcus Sheffer, Feb 13, 2012, 2:59 pm |
|
Reclaimed water and Health impactsNC-2009 WEc1: Water Efficient Landscapingposted by Susan Walter on Feb 8, 2012, 10:30 am
Our healthcare project is planning on capturing condensate water and excess rain water from a 12,000 s.f. vegetated roof in a cistern to irrigate plantings which include a small lawn area in a... Last reply: Susan Walter, Feb 13, 2012, 2:18 pm |
|
high-rise residential buildingLEED Rating System Selectionposted by Adam Targowski on Feb 13, 2012, 4:26 am
Can a high-rise residential building be certified under LEED Core&Shell? If yes, what is the minimum amout of stories that the building should have (4 or 7)? Last reply: David Posada, Feb 13, 2012, 1:47 pm |
|
Strategy changes after construction reviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Michael Smithing on Feb 9, 2012, 8:27 am
1. On a CI project we made a mistake on our water efficiency calculations that means we will not be able to achieve the exemplary performance for either our space or the entire building (SSc1,... Last reply: Susann Geithner, Feb 13, 2012, 1:43 pm |
|
LPD for space with higher headroomNC-2009 EAc1: Optimize Energy Performanceposted by William Wong on Feb 12, 2012, 8:55 pm
Does anyone know what headroom height are based on when ASHRAE design the... Last reply: Marcus Sheffer, Feb 13, 2012, 9:41 am |
|
external lighting LPD contribution to percentage energy savingsCS-2009 EAc1: Optimize Energy Performanceposted by Puteri Shireen Jahnkassim on Feb 11, 2012, 11:54 am
Hello there What does this mean : Ensure that no credit is taken in the proposed case for lighting reduction on tradable surfaces" Does this mean if the... Last reply: Marcus Sheffer, Feb 13, 2012, 9:35 am |
|
Team Members Blocked from accessing the ProjectGeneral forumsposted by Mairead Morrissey on Feb 10, 2012, 6:28 am
Hi, I'm not sure if this is the place for this post but I can't find a more relevant one. Two team members who had registered with LEED online, found they were blocked when trying to access the... Last reply: Mairead Morrissey, Feb 13, 2012, 3:13 am |
|
fan power calculationCS-2009 EAp2: Minimum Energy Performanceposted by Johannes Gellrich on Oct 12, 2011, 5:21 am
Hi everyone, Last reply: Marcus Sheffer, Feb 12, 2012, 3:06 pm |