Log in
Forum
Topic

Utility Company Project

NC-2009 EAc6: Green Power
posted by Ashonta Langdon on Feb 7, 2012, 10:12 am

The project I am working on is for a utility company. Can we pursue this credit if purchasing the...

Last reply: Marcus Sheffer, Feb 12, 2012, 2:03 pm

Occupancy Sensor definition

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by CRB Sustainability on Jan 18, 2012, 1:58 pm

I am not seeing a definition for an occupancy sensor in the 2009 CI reference guide. Would lights that are placed on a timer that automatically shuts off after a period of time (15 min, 1hr etc...

Last reply: Dan LeBlanc, Feb 11, 2012, 1:26 pm

Connected lighting load include exterior lighting?

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by CRB Sustainability on Jan 18, 2012, 1:55 pm

I would assume that the connected lighting load calculation for Option 2 or 3 would not include the exterior lighting since the exterior areas would not (normally) be on an occupancy sensor (...

Last reply: Dan LeBlanc, Feb 11, 2012, 1:06 pm

Daylight Controls for 50% of Lighting Load?

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by Simon Ng on Jan 17, 2012, 7:44 pm

Dear all, I am working on a CI Library renovation and we have an existing cellar where the majority of the services exist (IE. Boilers, IT Servers). The cellar, which counts for 1/3 of our LEED...

Last reply: Dan LeBlanc, Feb 11, 2012, 1:05 pm

LEED HC IEQ c2

LEED for Healthcare forum
posted by James Chueh on Jan 9, 2012, 4:29 am

Hi all,
I have some questions on this credit.
1. To meet the Site Exterior Noise, Table 1.3-1 of the 2010 SV Guidelines has defiend the exterior site noise exposure categories A...

Last reply: James Chueh, Feb 11, 2012, 12:59 pm

Existing Imperviouness

CS-2009 SSc6.1: Stormwater design - quantity control
posted by Markus Henning on Feb 10, 2012, 11:50 am

My question is. The Guide says choose Case 1 Sites with Existing...

Last reply: Emily Catacchio, Feb 10, 2012, 8:22 pm

Sampling Rate

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Ehsan Baharvand on Dec 29, 2011, 4:11 am

Hi,
I have an issue with regard to CO2-metering in practice.
An important question coming on my mind - and...

Last reply: Dylan Connelly, Feb 10, 2012, 2:22 pm

Documenting Waste Management on LEEDonline forms

NC-2009 MRc2: Construction Waste Management
posted by angela cardwell on Feb 6, 2012, 5:30 pm

How should we input...

Last reply: RETIRED, Feb 10, 2012, 1:01 pm

Raised Floor

CI-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Natalie Wong on Jan 4, 2012, 4:06 am

Hi, I would like to ask whether a raised floor applies to IEQc4.3?
If yes, what criteria does it need to meet?
As the product is from Europe, it is hard to find the certificate to...

Last reply: Lauren Sparandara, Feb 10, 2012, 11:42 am

Commissioning firm instead of a specific person?

NC-2009 EAc3: Enhanced Commissioning
posted by Veronika Sundberg on Feb 10, 2012, 7:27 am

Since our project is quit big we have hired an independent firm for our...

Last reply: Blas Beristain, Feb 10, 2012, 8:41 am