Forum » Credit Forums
Topic

Energy Star for a Manufacturing- Assembly Company

EBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessment
posted by Robert McNeice on Dec 3, 2009, 1:52 pm

I'm working with a client that is a manufacturing/...

Last reply: Gregory Miller, Oct 12, 2010, 11:04 am

SFI vs. FSC

EBOM-2009 MRc1: Sustainable purchasing - ongoing consumables
posted by Tim Trefzer on Oct 12, 2010, 10:50 am

I am aware that USGBC has been contemplating including SFI-certified products into certain credits as not to monopolize...

Last reply: Tristan Roberts, Oct 12, 2010, 10:55 am

FCUs running during flush out- Y?N

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Chellapillai Srinivasan on Oct 12, 2010, 3:11 am

Is it required to run FCUs or any other
units which just re-circulates the room air during flush out process?

If it is not required then we don’t want
to put the...

Last reply: Allison Beer McKenzie, Oct 12, 2010, 8:25 am

Energy Star: User Consumption in Multi Tenant Buildings

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Joerg Schlenger on Sep 27, 2010, 4:24 am

Office Buildings outside the U.S. should use the Energy Star Portfolio Manager to benachmark their energy performance. Do the energy consumptions entered to the protfolio manager have to include...

Last reply: Joerg Schlenger, Oct 12, 2010, 2:53 am

Energy Use Breakdown Scenario

EBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessment
posted by Alexa Stone on Sep 23, 2010, 1:15 pm

Hello, we are trying to keep the Energy Audit in house and make use of the experienced staff of the client we are working with. However, we are having trouble calculating some of the numbers due...

Last reply: Jenny Carney, Oct 11, 2010, 3:38 pm

How does this pilot credit link to the 'process loads' in EA1?

Pilot-Credits EApc3: Medical and process equipment efficiency
posted by Edwin Wealend on Sep 28, 2010, 3:30 am

Hi all,
Im working on a LEED project located in Australia and Im new to the LEED energy model requirements and ASHRAE 90.1. My project is a medical research building, with high process...

Last reply: Marcus Sheffer, Oct 11, 2010, 2:55 pm

Min. Occupancy required for any LEED EBOM Project

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Bala Srini on Oct 5, 2010, 9:58 am

The occupancy requirement for buildings to earn the ENERGY STAR label has been lowered to 50%. So whats the min. occupancy required for any LEED...

Last reply: Jenny Carney, Oct 11, 2010, 2:44 pm

Post '93 Construction- Requirements?

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Dianne Herrin on Mar 19, 2010, 1:37 pm

Hi - My building is just over a year old. Am I correct in that all I need to do to meet this prerequisite is:
1-Verify construction date and fixture types (either through construction docs...

Last reply: Jason Franken, Oct 11, 2010, 2:43 pm

Office Tower and Annex Cafeteria/auditorium

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Michael Chermak on Oct 6, 2010, 2:51 pm

If a LEED project consists of two 9-story office towers and a 3-story cafeteria/auditorium (all connected), what is the best approach for meeting Energy Star rating for the 3-story cafeteria/...

Last reply: Jenny Carney, Oct 11, 2010, 2:42 pm

required Upload for IEQ p1

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Amanda Roelle on Jan 15, 2010, 3:49 pm

Does anyone have a sample for the upload required for IEQ P1:

"Graphic and numeric summary of the airflow analysis performed. Include the boundary conditions used for the analysis,...

Last reply: Tristan Roberts, Oct 11, 2010, 12:58 pm