Log in
Forum » Credit Forums
Topic

SRI value for an existing copper roof

NC-2009 SSc7.2: Heat island effect - roof
posted by Bill Swanson on Jan 14, 2010, 4:09 pm

In response to an earlier thread on...

Last reply: Tristan Roberts, Oct 15, 2010, 11:02 pm

Total Site Area- LEED Boundary or Property Line?

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Peter Wurst on Oct 14, 2010, 8:12 pm

We are renovating an existing building, providing a large footprint of new construction, and have designated the LEED boundary for our project to include all site that has been disturbed or...

Last reply: Tristan Roberts, Oct 15, 2010, 10:57 pm

Day Care in LEED-NC 2.2

NC-2009 WEp1: Water Use Reduction
posted by sara theodore on Oct 15, 2010, 10:27 am

I have a daycare facility with children from 0 yrs old to preschool age with one classroom for after school kids which I assume is older children. Realistically, I’d say all the children would...

Last reply: Tristan Roberts, Oct 15, 2010, 10:45 pm

SMACNA guidelines

EBOM-2009 IEQc1.5: Indoor air quality best management practices - indoor air quality management for facility additions and alterations
posted by Jutta Berns on Oct 12, 2010, 8:45 am

do draft the...

Last reply: Allison Beer McKenzie, Oct 15, 2010, 10:38 pm

meter owned by building owner or utility

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Rachael McClain on Oct 12, 2010, 12:55 pm

I was wondering if someone could clarify something for me. We have a situation where we need to submeter our builidng because it currently shares a meter with other buildings. The reference...

Last reply: Jenny Carney, Oct 15, 2010, 8:51 pm

Total credits by ex exemplary performance

CS-2009 IDc1: Innovation in Design
posted by javier bolanos zeledon on Sep 26, 2010, 3:59 pm

On CS 2.0 How many credits from the 1.1-1.4 can you earn by exemplary performance. I know for v 2009 is three, but I don't know if this is a change between CS2.0 and V2009. Thanks.

Last reply: javier bolanos zeledon, Oct 15, 2010, 6:58 pm

Retention Pond = zero potable water usage?

EBOM-2009 WEc3: Water Efficient Landscaping
posted by Paul C on Sep 13, 2010, 3:11 pm

Our project site has man-made on-site ponds which we use for irrigation and any run-off goes back into the ponds so we do not use any city potable water supply. Would the ponds be considered a...

Last reply: Tristan Roberts, Oct 15, 2010, 4:51 pm

Refrigerant Phase Out Feasibility

NC-2009 EAp3: Fundamental Refrigerant Management
posted by Michael Tillou on Oct 5, 2010, 12:19 pm

We are designing a building for a client that will use purchased steam and chilled water from a local central plant. The central plant still has R-11 chillers and we advised them they needed a...

Last reply: Shillpa Singh, Oct 15, 2010, 4:36 pm

Certification Period

CI-2009 IEQc4.5: Low-emitting materials - systems furniture and seating
posted by Lori Selcer on Oct 14, 2010, 4:40 pm

The EQ4.5 template form requires that the "Test Date or Certification Period" be supplied. the Greenguard Certificate of Compliance provides a period range of compliance, not a single date. the...

Last reply: Tristan Roberts, Oct 15, 2010, 6:36 am

Regarding Performance Period for LEED O+M (EB)

EBOM-2009 EAc1: Optimize Energy Efficiency Performance
posted by Ramesh Narayanan on Oct 13, 2010, 11:52 pm

Hi Friends,
I knew that all the credits and prerequisites should have the performance period of 3 months except EApr2 & EAcr1 which is required minimum of12 months energy consumption...

Last reply: Tristan Roberts, Oct 15, 2010, 6:34 am