Log in
Forum » Credit Forums
Topic

Envelope mandatory provisions

CS-2009 EAc1: Optimize Energy Performance
posted by javier bolanos zeledon on Oct 24, 2010, 7:18 pm

According to Ashrae 90.1-2007 art 5.4.1 where insulation is required in sections 5.5 or 5.6 it shall comply with 5.8.1.1-5.8.1.9. What is not clear to me is if you have to comply with the...

Last reply: javier bolanos zeledon, Oct 25, 2010, 12:07 pm

printer rooms in tenant scope of work

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Victoria Lockhart on Aug 27, 2010, 9:43 am

From the wording in the reference guide, I had understood that the ventilation requirements of printer rooms are not relevant in CS where these are part of the tenant fit-out (CS guidance, page...

Last reply: Victoria Lockhart, Oct 25, 2010, 11:45 am

LEED V3- E-mail Communications and Role Identification Matrix

NC-2009 MRc7: Certified Wood
posted by Keerthi Ratnayake on Oct 22, 2010, 11:55 am

I have two questions.

1. Does LEED accept e-mail communications (to and from client, contractor, design team etc.) as valid documentary proof for various credits?

2. Does LEED has a...

Last reply: Doug Pierce, AIA, Oct 24, 2010, 9:47 pm

Wall on Site Boundary

NC-2009 SSc8: Light Pollution Reduction
posted by Omer Moltay on Oct 23, 2010, 3:01 pm

We have a 2 m. high brick wall running all around out site. This wall belongs to the property so it is within the site boundary and the site boundary runs exactly along the outside surface of the...

adding two G+2 retails buildings to the designed building

NC-2009 EAc1: Optimize Energy Performance
posted by Tarek Dalati on Oct 18, 2010, 4:11 am

we are working on a mixed use tower (80% residential and 20% office)and we applied to...

Last reply: Marcus Sheffer, Oct 22, 2010, 10:02 am

Option 1- Equipment Efficiency

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Nancy Henderson on Oct 21, 2010, 6:53 pm

We have a new build out of a small office in an existing industrial building. We will be adding new package roof top units with DX cooling and gas heat to condition the office space. We are...

Last reply: Paul Conrad, Oct 22, 2010, 9:58 am

Unable to obtain cut sheet

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Simon Sue on Oct 18, 2010, 10:03 pm

we install a low flow device into our blow out fixture and a external testing show the installed device capable to save 20% water once it been installed. we excited about it, and make the...

Last reply: Dan Ackerstein, Oct 22, 2010, 9:38 am

Audit Form for Classroom

EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessment
posted by Bina Indelicato on Oct 20, 2010, 12:04 pm

We are preparing a LEED EB certification for a school and need an audit form for classroom areas. Is there one available for free or do we need to purchase the...

Last reply: Allison Beer McKenzie, Oct 22, 2010, 9:06 am

More than one existing building on site.

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Dave Wortman on Oct 15, 2010, 6:30 pm

Our site includes two existing buildings. One is being deconstructed, the other is being remodeled. Do we include the deconstructed building in the calculations for MR Credit 1.1?

Last reply: Anne Nicklin, Oct 22, 2010, 2:01 am

Views in Gymnasium

Schools-2009 IEQc8.2: Daylight and views - views
posted by Jay Murray on Oct 20, 2010, 3:22 pm

Similar to previous comment threads, this involves a gym. There are many windows around the gym, but they are all 18'-0" above finish floor for practical reasons. Basketballs hitting lower...

Last reply: Tristan Roberts, Oct 22, 2010, 1:47 am