Topic | Recent |
---|---|
Mandatory for plug fansNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Dec 23, 2014, 4:23 am
Is Table 10.8 mandatory for plug fans of new buildings? The fans are installed in Air Handling Units. If they are mandatory, are they mandatory both for supply fans and for return fans? Last reply: Marcus Sheffer, Jan 9, 2015, 11:07 am |
|
Electric Resistance HeatingCS-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Dec 9, 2014, 4:30 am
What are the mandatory provisions for fan coils whose coils are heated through electrical resistances? I think par. 6.4.3.3.1 for the control. Last reply: Marcus Sheffer, Dec 9, 2014, 2:46 pm |
|
MR cr2: Option2NC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Remigio Antonio Rancan on Nov 16, 2014, 12:36 pm
Hi all. I’d like to give the right interpretation about option2. I do understand that Impact reduction of certified product must be satisfied for 3 of the 6 categories at minimum, in order to... Last reply: Remigio Antonio Rancan, Nov 22, 2014, 3:47 am |
|
lighting schedule for schoolNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Nov 6, 2014, 11:54 am
I’m modeling a school that is located in Italy, longitude 46°N. In a comment of the preliminary review the reviewers wrote that the equivalent hours of full load of the internal lights seem too... Last reply: Marcus Sheffer, Nov 7, 2014, 9:37 am |
|
200 yards from entranceCS-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Gianluca Padula on Sep 23, 2014, 8:12 am
Walking distance or crow flies? Last reply: LEEDme Lorenzi, Nov 3, 2014, 8:12 am |
|
GoO equivalency to Green-e StandardNC-v4 EAc7: Green power and carbon offsetsposted by Paola Moschini on Oct 15, 2014, 7:07 am
Dear All, Last reply: Marcus Sheffer, Nov 2, 2014, 6:53 pm |
|
Exception b. of G3.1.1 and setpoint temperatureNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Oct 22, 2014, 11:27 am
Exception b. of G3.1.1 states: “use separate single-zone systems (..) for any spaces that have occupancy or process loads or schedule that differ significantly from the rest of the building”. Are... Last reply: Marcus Sheffer, Oct 23, 2014, 11:13 am |
|
Multi-purpose unit for 4-pipe systemsNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Oct 10, 2014, 11:30 am
I'm considering a "Multi-purpose indoor unit for use in 4-pipe systems for the simultaneous production of chilled and hot water by means of two independent water circuits". The unit transfers... Last reply: Marcus Sheffer, Oct 10, 2014, 5:00 pm |