
Forum quick links
baseline system selection for building with very different internal gains in different zones.
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Hi!
Plug loads Process Loads savings vs baseline
CI-v4 EAc2:Optimize energy performanceposted by Xavier Valladares on
Hi All,
Is it possible and if so, how would you justify savings in plug and process loads for an interior fit out energy model vs baseline? Can you claim a percentage reduction if
Air-Cooled Chiller Efficiency Compliance with ASHRAE 90.1-2016 and LEED v4.1
NC-v4.1 EAp2:Minimum Energy Performanceposted by Amgad Khattab on
We are working on a project pursuing LEED v4.1 certification using the Appendix G Performance Path.
Regd. reheat coils used in terminal boxes in a hospital project
NC-v4.1 EAp2:Minimum Energy Performanceposted by Anurag Ghosh on
Hi, we have a hospital project following ASHRAE 90.1 2013 and having cooling as the predominant system.
plastic laminate?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Erin Holdenried on
Looking for recommendations on how/where to include plastic laminate (such as for millwork and cabinetry) and laminate adhesive for this credit. In the composite wood category? &nbs
Regd. heating system to be selected in baseline energy model as per ASHRAE 90.1 2013
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hi, we have a hospital project in India following ASHRAE 90.1 2013 and having cooling as the predominant system.
Reuse/ Salvage Materials for Option 2 - Path 4
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by Eslam Elshorbagy on
Hi everyone,
Service Water Heating with Solar Collectors
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi Everyone,
Issues in meeting the credit requirements of Advanced Energy Metering
NC-v4 EAc3:Advanced energy meteringposted by Alokmay Behera on
Greetings.
Modeling 100% Fresh Air Casino Floor in LEED v4.1
NC-2009 EAp2:Minimum Energy Performanceposted by Kathy Collins, LEED AP , WELL AP, CxA BE Cx on
I am working on a hotel project where the ground floor is entirely dedicated to a casino. This casino floor is served by 8 AHUs, all supplying 100% fresh air.