Topic | Recent |
---|---|
Finished woodCI-v4 EQc2: Low-emitting materialsposted by Devani PERERA on May 17, 2017, 9:18 am
A finished... Last reply: Reinhard Oppl, Aug 27, 2017, 8:38 am |
|
LEED for office with few modificationsCI-v4 MPR3: Must comply with project size requirementsposted by Devani PERERA on May 4, 2017, 6:07 am
A project I assess is seeking LEED v4 CI Silver. It is a 5877,1sqft rented office, in an existing building (previously certified Breeam in-use), that is undergoing fit-out (minor improvements =... Last reply: Tristan Roberts, Aug 26, 2017, 2:03 pm |
|
Certify only one floor among three floors that are rentedCI-v4 MPR2: Must use reasonable LEED boundariesposted by Diana Nezamutinova on Jun 21, 2017, 10:12 am
Would you please advise if one newly acquired floor of a 3-floor office eligible to get certified under LEED v.4 Commercial Interiors (see details below)? - A company XYZ has been renting... Last reply: Tristan Roberts, Aug 26, 2017, 2:01 pm |
|
Conditions for site fenceNC-2009 SSp1: Construction Activity Pollution Preventionposted by Julian Bork on Apr 27, 2017, 9:51 am
Hello everybody Last reply: Tristan Roberts, Aug 26, 2017, 10:12 am |
|
Connected underground car parksNC-v4 LTc7: Reduced parking footprintposted by Florian Schmidtchen on Apr 4, 2017, 11:56 am
Dear all. We are working on a LEED v4 NC campus project in which two (office) buildings pursuing a LEED certification. In the course of constructing the buildings will provided with two... Last reply: Tristan Roberts, Aug 26, 2017, 8:55 am |
|
Extent of European ACP applicationNC-v4 EQp1: Minimum indoor air quality performanceposted by Jens Apel on Jun 26, 2017, 4:49 am
I am not quite sure on the wording regarding natural ventilation and the Europe ACP. Last reply: RETIRED, Aug 15, 2017, 11:53 am |
|
Operable windows-ground floor or upperfloor?NC-v4 EQp2: Environmental tobacco smoke controlposted by Florian Schmidtchen on Jun 2, 2017, 10:26 am
Dear Sir or Madam, Last reply: Trista Brown, Aug 14, 2017, 7:59 pm |
|
LED integrated in facade window frame/ MLO lighting zoneNC-v4 SSc6: Light Pollution Reductionposted by Ilse Dijkstra-Nugteren on Aug 11, 2017, 4:42 am
We are working on the LEED V4 certification of a project which will be located at the border of a business park and about 3 kilometers away from highways and an international airport. Between the... Last reply: Bill Swanson, Aug 11, 2017, 8:33 am |
|
Elevator lobbies-with airlocks?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Florian Schmidtchen on Aug 9, 2017, 11:44 am
Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention. To create negative pressure... |
|
Operable windows in lieu of controls- what about WOCDsCS-2009 IEQc6: Controllability of systems - thermal comfortposted by Andreas Hintz on Jul 26, 2017, 9:02 am
For determing the openable wall area (which has to be a minimum of 4% of the net occupiable floor area) should WOCDs (Window Opening Control Devices) be considered? Please explain how to... Last reply: Lauren Sparandara, Aug 7, 2017, 1:46 pm |