Topic | Recent |
---|---|
Data Storage RequirementNC-v4 EAc3: Advanced Energy Meteringposted by Shannon Oletic on Jul 18, 2019, 2:04 pm
Hello, Most digital metering systems with remote access capabilities have a cloud-based system were data can be stored indefinitely, or until the meter becomes inactive. Looking... Last reply: Marcus Sheffer, Jul 19, 2019, 5:09 pm |
|
LEED ND v4 Pilot Credit Integrative Process- Participation in the ForumND-Plan-v4 INc1: Innovationposted by Charlotte Bodnar on Jul 15, 2019, 12:04 pm
As part of the requirements for this pilot credit, we are noting our participation in the Forum for a project located in Montreal that aims the LEED ND v4 certification. Since our project... Last reply: Eliot Allen, Jul 15, 2019, 12:40 pm |
|
LEED ND v4 Pilot Credit Integrative Process- Participation in the ForumPilot-Credits IPpc101: Integrative processposted by Charlotte Bodnar on Jul 15, 2019, 10:47 am
As part of the requirements for this pilot credit, we are noting our participation in the Forum for a project located in Montreal that aims the LEED ND v4 certification. A list of team... |
|
Construction Activity pollution prevention inspectionsNC-v4 SSp1: Construction Activity Pollution Preventionposted by Irene Carreno on Aug 17, 2017, 1:27 pm
Hello. Last reply: Jose Gonzalez, Jul 10, 2019, 4:18 pm |
|
Total Building Energy UseEBOM-v4.1 EAp3: Energy Performanceposted by Ben McEwen on Jun 13, 2019, 3:50 pmDave Hubka Practice Leader- Sustainability EUA LEEDuser Expert 530 thumbs up June 17, 2019- 11:01 pm the EBOM v4.1 Water Performance prereq requires process water consumption to be included; however the Energy Performance prereq does not specifically state "process energy consumption" within the reference guide language but rather 'total building energy'. My guess is that GBCI will require you to enter both energy consuming end uses you listed above. Send the question over to the technical customer service https://www.usgbc.org/contactus and post the response to the forum. Log... Last reply: Dave Hubka, Jun 17, 2019, 11:01 pm |
|
ASHRAE Level 1 Energy AuditEBOM-v4.1 EAp1: Energy Efficiency Best Management Practicesposted by Ben McEwen on Jun 13, 2019, 2:48 pm
Regarding the Energy Audit Prerequisite, is there an acceptable age range for a pre-existing energy Audit that was conducted on the building in question? If there was a Level 1 Energy Audit... Last reply: Dave Hubka, Jun 17, 2019, 10:41 pm |
|
Minimum Indoor Air Quality Performance Calculator: critical zones and demand-controlled ventilationEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Vincent Dupuy on Jun 13, 2019, 4:22 pm
We are working on certifying a building (... |
|
UL/Ecologo category 2794 for certified disinfectants not listed in the recommended products??EBOM-v4 EQp3: Green Cleaning Policyposted by Martine Menard on Jun 11, 2019, 1:51 pm
Why is UL/Ecologo category 2794 (for disinfectants) NOT LISTED in the recommended products to be used??? Is this a mistake? enduser is asking to get an approved disinfectant …..help. ... Last reply: Stephen Ashkin, Jun 11, 2019, 6:36 pm |
|
Major renovation to existing building- EQp1 requirementsNC-v4 EQp1: Minimum indoor air quality performanceposted by Navisa Jain on May 23, 2019, 10:25 am
We have a 6 storey addition to an existing 4-storeyed building. The mechanical systems for the addition are separate from the existing systems. The project is going for LEED v4 CS certification... Last reply: David Posada, May 31, 2019, 4:17 pm |
|
Fixtures for Option 2 Lighting Quality, Strategy D.NC-v4 EQc6: Interior lightingposted by Geoffrey Katz on Mar 13, 2017, 11:30 am
A recessed LED troffer type fixture may have an indirect light component by way of internal reflectors that reflect upward-directed light within the fixture back down onto the space below. Would... Last reply: Neil Rosen, May 30, 2019, 10:54 am |