Pilot credit wakable siteCS-v4 INc1: Innovationposted by Tobias Berge on Sep 7, 2017, 4:53 am
We chose to achieve a pilot credit called wakable sites. Unfortunately we discoverad that the credit is closed. We have register the project on LEED online but not registered this specific credit... Last reply: Tristan Roberts, Sep 9, 2017, 3:04 am |
|
Switching between Options 1 and 2CI-v4 EAc2: Optimize Energy Performanceposted by Meike Borchers on Sep 1, 2017, 7:47 am
We have submitted our initial design stage submittal and received commentary on our Option 2 approach - Prescriptive compliance. However, we have since carried out energy simulation and found... |
|
Transportation Planning HandbookNC-v4 LTc7: Reduced parking footprintposted by Susannah Goddard on Jan 15, 2016, 11:46 am
I don't have a copy of this to hand but need to know the content of Tables 18-2 to 18-4. Am I required to purchase a copy of this book in order to determine the appropriate base ratios, or are... Last reply: Kimberly Schlaepfer, Aug 31, 2017, 6:53 pm |
|
Increased ventilation instead of alarms?NC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Maria Porter on Aug 23, 2017, 3:11 am
I understand that for densely occupied spaces an alarm (visible or audible) is required. If a sensor was installed in the room, but instead of beeping/flashing it would increase the ventilation... Last reply: Andrew Mitchell, P.E., Aug 30, 2017, 8:54 pm |
|
Open parking under the buildingCS-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Rasita Masalskyte on May 19, 2017, 9:54 am
Dear all, We have a case where an open parking garage is located on the ground floor (under the building). Apparently, no exchaust system can be applied in this case. Last reply: Dylan Connelly, Aug 30, 2017, 1:02 pm |
|
Car wash in parking garageEBOM-2009 WEc1: Water Performance Measurementposted by Rasita Masalskyte on Mar 1, 2017, 8:38 am
Hi all, We have a case where there is an office ("main" building) and a separate parking garage (that serves the office) within LEED project boundary. Last reply: Ben Stanley, Aug 29, 2017, 2:13 pm |
|
Renewable EnergyCI-v4 EAc4: Renewable energy productionposted by Maria Glädt on Dec 17, 2014, 2:05 pm
See quotation from LEED-CI. "Use tenant... Last reply: Marcus Sheffer, Aug 28, 2017, 10:22 am |
|
Renewable Energy in CS projectCI-v4 EAc4: Renewable energy productionposted by Sara Johansson on Mar 29, 2017, 9:36 am
Is the tenant obliged to install additional... Last reply: Marcus Sheffer, Aug 28, 2017, 10:17 am |
|
PPA as renewable energy production?CS-v4 EAc5: Renewable energy productionposted by Lai-San wong on Jun 12, 2017, 9:38 am
Hi! In the requirement for EAc5 (BD+C) it is stated: Last reply: Marcus Sheffer, Aug 28, 2017, 9:41 am |
|
Can this credit be achieved if no minimum local code requirementCI-v4 LTc5: Reduced parking footprintposted by Juliana Moreira on Apr 26, 2017, 10:46 am
I am working on an office fitout in central London where there are no minimum local code requirements for parking spaces. The code actually limits the amount of parking spaces to a maximum of 1... Last reply: emily reese moody, Aug 28, 2017, 1:50 am |