Topic | Recent |
---|---|
Core area added to boundary?CI-2009 WEp1: Water Use Reductionposted by Graham Langton on Nov 24, 2014, 12:13 pm
"When a project has replaced some of the core fixtures, they have essentially brought those fixtures into their LEED-CI project scope of work." A project in which fixtures are replaced in... |
|
FTEs and Total Daily Uses for ShowersCI-2009 WEp1: Water Use Reductionposted by Rodrigo Gomez Junco on Sep 26, 2014, 1:07 pm
Hi, I think I know the answer to this but can the number of FTEs vary between showers and other fixture groups or should they be consistent? I know the amount of showers required depend on... Last reply: William Weaver, Nov 10, 2014, 2:30 pm |
|
Non-default shower useCI-2009 WEp1: Water Use Reductionposted by Susannah Goddard on Sep 25, 2014, 4:22 am
The USGBC raised the following query in our project design stage review: "It is not clear that the shower usage reported accurately reflects the usage patterns of the project. Given the... Last reply: Michelle Rosenberger, Sep 25, 2014, 4:35 pm |
|
WEp1 Exemption?CI-2009 WEp1: Water Use Reductionposted by Cathal Heneghan on Aug 19, 2014, 4:36 am
Hi I am working on a CI 2009 project in Dublin, Ireland. The project is an office TI involving the bottom 3 floors of a 5 floor building. Two of these floors have a landlord central core with... Last reply: Scott Adams, Aug 22, 2014, 1:09 pm |
|
Credit Template TroublesCI-2009 WEp1: Water Use Reductionposted by Glen LeComte on Mar 21, 2014, 10:45 am
I am filling out the pre-requisite template for our LEED 2009 CI project. There are only 2 Break Room Sinks for the project. I have filled in all of the pertinent data and the form calculator... Last reply: Tristan Roberts, Jul 26, 2014, 1:20 am |
|
Flow Fixture Data tableCI-2009 WEp1: Water Use Reductionposted by Jaclyn Noga on Jul 22, 2014, 6:02 pm
I am working on a project that has one sink in each of the two utility rooms in the building. In the Flow Fixture Data table, I am wondering which fixture family the utility faucet belongs to?... Last reply: Scott Adams, Jul 23, 2014, 10:28 am |
|
Commercial kitchen handwashingCI-2009 WEp1: Water Use Reductionposted by Jatuwat Varodompun on May 2, 2014, 4:42 am
In a restaurant, we have a foot padel hand washing for food preparation of restaurant staffs. Does it require to include this equipment in the calculation by using baseline of 0.5 gpm? Last reply: Scott Adams, Jul 17, 2014, 11:06 pm |
|
TI in a LEED certified Core & Shell BuildingCI-2009 WEp1: Water Use Reductionposted by Chris Hammett on Jul 9, 2014, 7:56 pm
Hello. I am currently working on a tenant improvement project located within a building that was previously LEED certified under the Core & Shell rating system. The tenant is pursuing LEED... Last reply: Scott Adams, Jul 17, 2014, 10:45 pm |
|
No water useCI-2009 WEp1: Water Use Reductionposted by Henrique Mendes on Nov 13, 2013, 12:57 pm
What happens if we are working on a project that has no water use. No fixture or fittings... Last reply: Ashley Nedza, May 5, 2014, 11:54 am |
|
Fixture ReplacementCI-2009 WEp1: Water Use Reductionposted by Patrick Salmon on Apr 7, 2014, 11:33 am
Our project will be pursuing the thirty percent (30%) savings threshold by including fixtures both within and outside the LEED project boundary. Based on the use of existing waterless urinals... Last reply: Carlie Bullock-Jones, Apr 7, 2014, 2:44 pm |