Log in
Forum » EBOM-2009 SSc8
Topic

mechanical blinds outside the building

EBOM-2009 SSc8: Light Pollution Reduction
posted by David Feregrino on Jul 26, 2011, 6:30 pm

Hi there,

For interior lighting, the guide reference indicates that the direct beam illumination intersects solid or opaque surfaces and does not spill to the outside. My question is, the...

Interior Parking Garage Floors

EBOM-2009 SSc8: Light Pollution Reduction
posted by Terry Gorski on Jul 25, 2011, 3:51 pm

Has anyone had any experience on how to document this credit for buildings that have parking garage space taking up the first several above-ground floors of a large office tower? The parking...

Option 2- exterior lighting

EBOM-2009 SSc8: Light Pollution Reduction
posted by Jordanna Rubin on Jul 20, 2011, 3:39 pm

Our project site has a foutain/pond that has underwater lights. They are about 500 watts but down't really illuminate the surrounding areas. Do these need to be modified or can they stay since...

Exceptions for flag pole lighting

EBOM-2009 SSc8: Light Pollution Reduction
posted by Mark Stromberg on Apr 20, 2011, 1:36 pm

We have a client with a flag pole and they would like to leave a flag pole light which shines from the ground up to the flag. Is there an exception to the light tresspass or night sky issue? If I...

Light trespass at Property Line

EBOM-2009 SSc8: Light Pollution Reduction
posted by Mark Stromberg on Mar 9, 2011, 3:02 pm

Does LEED-2009 EBOM...

Exterior lighting option 3

EBOM-2009 SSc8: Light Pollution Reduction
posted by Xun Jia on Oct 20, 2010, 9:08 am

I registered a number of 0.0 footcandle locations, with lights both on and off. Will that be a concern or problem in submitting the data?

Exterior lighting- option 3

EBOM-2009 SSc8: Light Pollution Reduction
posted by Tanmay Tathagat on Sep 14, 2010, 3:53 am

Our project boundary is one feet thick masonry wall with wall lamps. Kindly share whether the measurement points at the perimeter should be inside the project boundary or outside, to meet the...

Performance Period

EBOM-2009 SSc8: Light Pollution Reduction
posted by Nell Boyle on Aug 30, 2010, 4:06 pm

So would the minimum performance period for this credit be 1 week or is it 90 days?

light pollution reduction for ' interiors of a resort building'

EBOM-2009 SSc8: Light Pollution Reduction
posted by Yong Lee Low on Aug 3, 2010, 11:45 pm

My project is a resort building where the public areas (lobby ,corridors etc )have automatic control panels to switch off lights after 11 pm.However,the remaining portion i.e. the guest rooms...

Interior Light Fixture exemption- no direct line of site

EBOM-2009 SSc8: Light Pollution Reduction
posted by John Ida on Jun 30, 2010, 9:25 pm

Our building is a warehouse with only a single string of clerestory windows at the peak of a gabled roof. All interior light fixtures are ceiling hung T-8s that are 10-12 feet below the bottom...