Environmental Tobacco Smoke (ETS) ControlNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Vanessa W. on Aug 5, 2016, 1:34 pm
For IEQ P2 Option A - do we need to have performance metrics in the policy we submit? Thank you Last reply: Tristan Roberts, Jan 18, 2017, 12:24 am |
|
Surrounding Area / AreasNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Omar Elrawy on Dec 5, 2016, 10:42 am
If a smoking zone is surrounded by 2 zones, is it sufficient to measure the differential pressure with respect to the zone where a door exist, or I must conduct measurement with respect to each... Last reply: James Wilson, Jan 8, 2017, 2:27 pm |
|
Vestibule for going out to a terraceNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Gustavo De las Heras Izquierdo on Oct 1, 2016, 2:10 pm
The owner wants to let users smoke in a 6mx6m terrace. Because of the 8 meters prohibition, he suggests to have an 8-meter long, positively pressurised vestibule before the terrace exit. ... Last reply: James Wilson, Jan 8, 2017, 2:12 pm |
|
non smoking hotel roomsNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Noriko Nagazumi on Aug 24, 2016, 4:49 am
Our project is hotel new construction project. Smoking is prohibited in all hotel rooms. In this case, no blower door test for hotel rooms is needed, is this correct? The LEED online form also... Last reply: Charalampos Giannikopoulos, Sep 3, 2016, 1:52 am |
|
Fire Exits, with no exterior handlesNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Jeff Chapman on Nov 30, 2011, 11:48 am
Are these an 'primary or secondary entry'? Last reply: Ileana Delgado, Jul 26, 2016, 12:16 pm |
|
Master's Research SurveyNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Vibha Pai on Jun 25, 2016, 6:41 pmMichelle Rosenberger Partner ArchEcology LEEDuser Premium Member 523 thumbs up June 26, 2016- 10:46 am I appreciate your need for info and posting on this forum. There are lots of great knowledgeable people here, some of whom may be able and willing to help. However posting your request on every different credit rather than just in the Material and Resources category has flooded my inbox with undesirable emails. I assume you did not realize this unintended consequence. Please keep your request to the area it pertains. Thank you. Log in or register to post comments Vibha Pai Project coordinator,... Last reply: Vibha Pai, Jun 26, 2016, 11:02 am |
|
Environmental Tobacco Smoke (ET S) Control RequiredNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Magda Aghababyan on May 13, 2016, 3:36 am
Hi, Last reply: Magda Aghababyan, May 25, 2016, 1:10 am |
|
Elevator Shafts in high rise condoNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Chris Wisniewski on Dec 2, 2015, 3:28 pm
I am the HERS rater working on a 80+ story condominium high rise. It is intended to be a "smoking permitted" building. Some of the residential units have in-unit access to the elevators. The... Last reply: Noriko Nagazumi, May 23, 2016, 11:08 pm |
|
Smoking Room, Smoking CabinNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Gabriela Crespo on Feb 29, 2016, 2:46 pm
Dear all, I have a question regarding the use of smoking cabins in a LEED project, has anyone ever tried to install one or is willing to share their experience? Would the requirement be... Last reply: Noriko Nagazumi, May 23, 2016, 10:57 pm |
|
Testing of units with the same layoutNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Ilana Judah on Apr 30, 2015, 4:10 pm
We are working on a large high-end high-rise residential project with a variety of unit sizes and layouts. Almost every unit is a unique layout to some degree, whether it be the location or size... Last reply: Tristan Roberts, Nov 27, 2015, 2:58 pm |