Topic | Recent |
---|---|
defination occupied spaces vs. ASHRAE 2011 handbookNC-v4 EQc9: Acoustic performanceposted by Ydo Schuuring on Nov 20, 2017, 2:14 am
dear all, Credit IEQc9 requires that all occupied spaces should meet the requirements of HVAC background noise and refers to 2011 ASHRAE handbook, chapter 48, table 1. This table gives the... Last reply: Levan Natadze, Feb 16, 2018, 6:56 am |
|
Compliance through furnished measurementNC-v4 EQc9: Acoustic performanceposted by Martin Stowell on Aug 16, 2017, 12:47 pm
Is it possible to achieve compliance for this credit by taking reverberation measurements once the multifamily units are occupied and furnished? The inclusion of furniture will have a significant... Last reply: Ken Shook, Feb 15, 2018, 5:43 pm |
|
Museum Building / Gallery AreasNC-v4 EQc9: Acoustic performanceposted by O Moltay on Sep 27, 2017, 9:15 am
Hi, we have a museum project with general exhibition areas: are there specific values for "... Last reply: Ken Shook, Feb 15, 2018, 5:42 pm |
|
Power generatorNC-v4 EQc9: Acoustic performanceposted by Alicja Bieszyńska on Apr 6, 2017, 7:00 am
Does this credit take power generators into account? It's not a HVAC equipment, however it's quite loud... Last reply: Tristan Roberts, Aug 30, 2017, 1:28 pm |
|
Can Building Envelope CxA be the acoustical engineerNC-v4 EQc9: Acoustic performanceposted by Edgar Arevalo on Aug 7, 2017, 4:49 pm
I know under LEED that the design engineers cannot also be the Cxa, but does that also apply for an entity/company who is the building envelope... Last reply: Scott Bowman, Aug 29, 2017, 1:06 pm |
|
Reverberation Time in Very Lage Open Office AreasNC-v4 EQc9: Acoustic performanceposted by Levan Natadze on Jul 18, 2017, 1:32 am
Hello, |
|
Reverberation Time and BIG Open AreaNC-v4 EQc9: Acoustic performanceposted by Avtua Kraveishvili on Jul 14, 2017, 2:36 am
If open plan office is linked with entrance, guest circulation areas and corridors from another zone (which totally takes about 2'000 m2), how we can calculate and predict... |
|
Reverberation Time and VolumeNC-v4 EQc9: Acoustic performanceposted by Avtua Kraveishvili on Jul 14, 2017, 2:19 am
Hi, I have project where is several open plan offices with different volumes. LEED Acoustic Performance requires T60 below 0.8 sec. But it's impossible to get this result for 3'000 square cube... |
|
STC rating for the combination office- hallwayNC-v4 EQc9: Acoustic performanceposted by Florian Schmidtchen on Jun 2, 2017, 11:24 am
Dear all, |
|
Acoustic performance: reverberation timeNC-v4 EQc9: Acoustic performanceposted by alessandro santuari on Jun 1, 2017, 9:28 am
Hi, we have a project with large waiting rooms: are there specific values for "... |