Topic

Operable windows-ground floor or upperfloor?

NC-v4 EQp2: Environmental tobacco smoke control
posted by Florian Schmidtchen on Jun 2, 2017, 10:26 am

Dear Sir or Madam,
Smoking must be prohibited within 25 feet of building entries, outdoor air intakes, and operable windows. A designated smoking area must be located at least 25 feet away...

Last reply: Trista Brown, Aug 14, 2017, 7:59 pm

Building Entrances

NC-v4 EQp2: Environmental tobacco smoke control
posted by Johanna Scogin on Aug 14, 2017, 3:11 pm

We have some overhead rolling doors (for trucks to enter the garage portion of the commercial building) along with some man doors. Does there need to be signage within 10' of all of the overhead...

Last reply: Trista Brown, Aug 14, 2017, 7:53 pm

Pressurization requirements in LEED v4

NC-v4 EQp2: Environmental tobacco smoke control
posted by Judhajit Chakraborty on Apr 18, 2017, 1:31 pm

We have a project where the hallways are pressurized to provide ventilation air thru door undercuts. In V3, there was a foot note which mentioned that for doors leading to pressurized hallways,...

Last reply: Kimberly Schlaepfer, May 17, 2017, 11:43 am

Compartmentalization

NC-v4 EQp2: Environmental tobacco smoke control
posted by soha yamani on Feb 14, 2017, 5:35 pm

I am really confused with the language of this credit , can you please clarify the below
1- Does EACH unit have to be sealed and Compartmentalized or only Residential units allowing smoking...

Last reply: Kimberly Schlaepfer, May 17, 2017, 11:31 am

Option 1 and Option 2

NC-v4 EQp2: Environmental tobacco smoke control
posted by Jen Roberts on Nov 15, 2015, 10:36 am

I just need clarification on something. In the reference guide, it states "Residential only" for Option 1. I thought Option 2 is only for residential as this option allows indoor smoking as long...

Last reply: Tristan Roberts, Nov 15, 2015, 12:43 pm

ETS During Construction

NC-v4 EQp2: Environmental tobacco smoke control
posted by Laurie Winter on Dec 16, 2014, 4:17 pm

Does the ETSC prerequisite apply during construction as well?

Last reply: Karin Miller, May 7, 2015, 6:09 pm