Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

IPpc98 feasibility for USACE projects

Pilot-Credits IPpc98:Assessment and Planning for Resilience
posted by  Alison Kerr  on 

The credit can be documented and achieved for USACE projects, and it is in line with Army customer increased attention to resilience.

0

IPpc98 feasibility for USACE projects

Pilot-Credits IPpc98:Assessment and Planning for Resilience
posted by  Alison Kerr  on 

The credit can be documented and achieved for USACE projects, and it is in line with Army customer increased attention

0
6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4452 thumbs up
Wed Jun 25, 2025, 1:05 am

Required documentation for WEc3 Option 1 Cooling Tower Cycles of Concentration

NC-v4.1 WEc3:Optimize Process Water Use
posted by  Mark Benson  on 

For Option 1 Cooling Tower Cycles of Concentration, in addition to filling out the Potable water analysis table and uploading "a narrative describing the methodology that was used to conduct the po

0
11
Mon Jun 23, 2025, 8:17 pm
2
Thu Jun 19, 2025, 9:30 pm

Painting HVAC Units on roof

NC-v4 SSc5:Heat island reduction
posted by  Deborah Stadler  on 

The client is close to getting the credit and wondered if painting the units on the roof would help.  I think it does from a heat island effect, but not from a LEED Credit point of view. 

0

Exhaust rate Table 6.5 ASHRAE 62.1 Clarifications for toilets

NC-v4.1 EQp1:Minimum Indoor Air Quality Performance
posted by  Alessandro Zuanon  on 

Dear all,

some questions about exhaust flow rates to be used for toilets form table 6.5 of ASHRAE 62.1:

0

Indoor Water Use calculations for Daycare

NC-v4 WEp2:Indoor water use reduction
posted by  Divya Shroff  on 

Can infants and toddlers be excluded from indoor water use calculations for a daycare facility? Given that they will be using diapers rather than water closets or lavatories. 

0