Design Build ProjectsNC-v4 IPc1: Integrative processposted by Michelle Rosenberger on May 1, 2017, 4:49 pm
Our region primarily uses design build which means that there are two very separate Schematic Design processes for our projects. Architectural plans often proceed past the permit stage before a... Last reply: Michelle Rosenberger, May 3, 2017, 12:58 pm |
|
simple box modelNC-v4 IPc1: Integrative processposted by Courtney Royal on Apr 25, 2017, 1:11 pm
how do you define a simple box model? for example, do you need to model thermal zones, etc. Last reply: Marcus Sheffer, Apr 26, 2017, 10:01 am |
|
Energy-related systemsNC-v4 IPc1: Integrative processposted by Lise Dannesboe on Aug 12, 2016, 2:35 am
Hi! We did some parameter studies in the early stage of the design process. Now i am wondering if we can use them for documentation of this credit. The criteria language in this credit says that... Last reply: Lise Dannesboe, Aug 15, 2016, 3:02 am |
|
Integrative Process (IP) Guide 2.0NC-v4 IPc1: Integrative processposted by Vitor Tosetto on Dec 4, 2014, 8:08 am
Please, someone knows where can I buy the Integrative Process (IP) ANSI Consensus National Standard Guide© 2.0? In ANSI's webstore I found v1.0 only. Last reply: Marcus Sheffer, Aug 4, 2016, 11:37 am |
|
Can I omit the IP credit since it is stand alone?NC-v4 IPc1: Integrative processposted by wachira sosaeng on Jul 30, 2016, 12:50 am
Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal. If we don't... Last reply: Marcus Sheffer, Aug 1, 2016, 11:21 am |
|
Adoption of Investigated StrategiesNC-v4 IPc1: Integrative processposted by Philippa Cameron on Oct 28, 2015, 10:51 am
Do you need to adopt all strategies that you demonstrate as facilitating best energy performance for this credit? If, for reasons other than energy use, it becomes clear that one or two of the... Last reply: Marcus Sheffer, Oct 28, 2015, 11:31 am |
|
Must non-potable water sources be used to earn IP credit?NC-v4 IPc1: Integrative processposted by Eesmyal Santos-Brault on Nov 6, 2014, 1:27 am
It appears that this credit can not be earned if a project does not meet some water demand through nonpotable sources. Can anyone confirm if not only consideration but actual use of nonpotable... Last reply: Marcus Sheffer, Aug 17, 2015, 4:02 pm |
|
Charrette duration / delivery flexible?NC-v4 IPc1: Integrative processposted by Vince Briones on Feb 20, 2015, 9:23 am
Has anyone had success with (2) 2-hr sessions being accepted as compliant (by... Last reply: Vince Briones, Feb 20, 2015, 2:47 pm |
|
PrerequisiteNC-v4 IPc1: Integrative processposted by Lorne Mlotek on Jun 9, 2014, 5:33 pm
Just want confirmation that there is no prereq for performing IP. Last reply: John Beeson, Jun 10, 2014, 10:30 am |