Forum » Sweden
Topic

Green Cleaning Policy

EBOM-v4.1 EQp3: Green Cleaning Policy
posted by Hanna Oberg on Mar 29, 2021, 5:29 am

Hi

I have a project where the tenant are responsible for the cleaning of every areas in the building, hence the property owner does not have any contracted cleaning for this specific...

Infill site

NC-v4 LTc3: High priority site
posted by Maria Porter on Jun 13, 2018, 7:42 am

Hi!
The credit language says: "Determine the percentage of land that is previously developed by dividing the previously developed area by the total land area less streets and rights-of-way...

Last reply: Hashir Usman, Feb 2, 2021, 11:46 am

Option 1 assessment for building with external movable elements, sDA and ASE assumptions

NC-v4 EQc7: Daylight
posted by IASON BOURNAS on Nov 12, 2020, 7:09 am

Hi,

we need to test compliance of an office building with the LEED v4 Daylight criteria (NC-v4 EQc7), following Option 1 (...

Enhanced acoustical performance Swedish project

Pilot-Credits EQpc57: Enhanced acoustical performance - exterior noise control
posted by Pia Öhrling on Dec 13, 2018, 1:58 pm

We are pursuing this pilot credit for two Swedish Projects. We Think it is good to look at exterior noise pollution but the requirements could be a bit stricter since we have more strict Swedish...

Last reply: Pavel Novotny, Nov 3, 2020, 6:17 am

Exemplary Performance

NC-v4.1 MRc5: Construction and demolition waste management
posted by Maria Porter on Oct 8, 2020, 5:44 am

EP seems to be removed in v4.1, correct? In v4 it was take both option 1 and 2.

Last reply: Maria Porter, Oct 8, 2020, 8:17 am

Baseline- Building Type- Mixed energy supply

NC-v4 EAp2: Minimum Energy Performance
posted by L on Sep 3, 2020, 5:39 am

Hi!

A building being designed for having a mixed yearly energy supply covering heat demand which consists of partly purchased heat (district heating from city network) and partly ground...

Last reply: Marcus Sheffer, Sep 8, 2020, 10:54 am

Four buildings in one certification?

Mid-Rise-v4 MPR2: Must use reasonable LEED boundaries
posted by Maria Perzon on Jan 13, 2020, 10:31 am

I am working with a customer discussing LEED certification for four similar residential buildings. They have only minor variations. Would it be possible to lower the costs by certifying it as one...

Last reply: Samuel Sura, Aug 10, 2020, 9:15 am

Minimum planted area (that needs no irrigation)

CS-v4 WEc1: Outdoor water use reduction
posted by Maria Porter on Oct 30, 2017, 8:05 am

Hi!

In v2009 there used to be a 5 % minimum for the area that needed to be planted in order for the project to be eligible for the credit. Is there such a threshold now? Or does basically...

Last reply: Maria Porter, Aug 10, 2020, 8:01 am

Batteries, mercury-containing lamps, and electronic waste

NC-v4 MRp1: Storage and Collection of Recyclables
posted by Maria Porter on Dec 19, 2019, 7:11 am

Chose to provide a recycling area for two of: batteries, mercury-containing lamps, and...

Last reply: Holly Ratafia, Jul 2, 2020, 11:12 pm

Is this a Design or a Construction credit?

CS-v4.1 EAc5: Renewable energy
posted by Maria Porter on Jun 18, 2020, 5:57 am

Hi,

Is this a design credit or a construction credit? Wanting to substitute v4 “Renewable energy” (a design credit) and “Green power and carbon offsets” (a construction credit) with this...

Last reply: Maria Porter, Jun 22, 2020, 3:07 am