Topic | Recent |
---|---|
Infill siteNC-v4 LTc3: High priority siteposted by Maria Porter on Jun 13, 2018, 7:42 am
Hi! Last reply: Hashir Usman, Feb 2, 2021, 11:46 am |
|
Option 1 assessment for building with external movable elements, sDA and ASE assumptionsNC-v4 EQc7: Daylightposted by IASON BOURNAS on Nov 12, 2020, 7:09 am
Hi, we need to test compliance of an office building with the LEED v4 Daylight criteria (NC-v4 EQc7), following Option 1 (... |
|
Enhanced acoustical performance Swedish projectPilot-Credits EQpc57: Enhanced acoustical performance - exterior noise controlposted by Pia Öhrling on Dec 13, 2018, 1:58 pm
We are pursuing this pilot credit for two Swedish Projects. We Think it is good to look at exterior noise pollution but the requirements could be a bit stricter since we have more strict Swedish... Last reply: Pavel Novotny, Nov 3, 2020, 6:17 am |
|
Exemplary PerformanceNC-v4.1 MRc5: Construction and demolition waste managementposted by Maria Porter on Oct 8, 2020, 5:44 am
EP seems to be removed in v4.1, correct? In v4 it was take both option 1 and 2. Last reply: Maria Porter, Oct 8, 2020, 8:17 am |
|
Baseline- Building Type- Mixed energy supplyNC-v4 EAp2: Minimum Energy Performanceposted by L on Sep 3, 2020, 5:39 am
Hi! A building being designed for having a mixed yearly energy supply covering heat demand which consists of partly purchased heat (district heating from city network) and partly ground... Last reply: Marcus Sheffer, Sep 8, 2020, 10:54 am |
|
Four buildings in one certification?Mid-Rise-v4 MPR2: Must use reasonable LEED boundariesposted by Maria Perzon on Jan 13, 2020, 10:31 am
I am working with a customer discussing LEED certification for four similar residential buildings. They have only minor variations. Would it be possible to lower the costs by certifying it as one... Last reply: Samuel Sura, Aug 10, 2020, 9:15 am |
|
Minimum planted area (that needs no irrigation)CS-v4 WEc1: Outdoor water use reductionposted by Maria Porter on Oct 30, 2017, 8:05 am
Hi! In v2009 there used to be a 5 % minimum for the area that needed to be planted in order for the project to be eligible for the credit. Is there such a threshold now? Or does basically... Last reply: Maria Porter, Aug 10, 2020, 8:01 am |
|
Batteries, mercury-containing lamps, and electronic wasteNC-v4 MRp1: Storage and Collection of Recyclablesposted by Maria Porter on Dec 19, 2019, 7:11 am
Chose to provide a recycling area for two of: batteries, mercury-containing lamps, and... Last reply: Holly Ratafia, Jul 2, 2020, 11:12 pm |
|
Is this a Design or a Construction credit?CS-v4.1 EAc5: Renewable energyposted by Maria Porter on Jun 18, 2020, 5:57 am
Hi, Is this a design credit or a construction credit? Wanting to substitute v4 “Renewable energy” (a design credit) and “Green power and carbon offsets” (a construction credit) with this... Last reply: Maria Porter, Jun 22, 2020, 3:07 am |
|
LEED EBOM v4 minimum occupancy requirementsEBOM-v4 EAp2: Minimum Energy Performanceposted by on Jun 16, 2020, 10:22 am
Hello, Does LEED EBOM v4 require a minimum occupancy requirement to be able to be certified? Our building is fairly new and we are aware of the full 12 months energy use. The... Last reply: Patrick Murisset, Jun 16, 2020, 2:59 pm |