Log in
Forum » Greece
Topic

Outdoor water use reduction LWR values

NC-v4 WEp1: Outdoor water use reduction
posted by Vasileios Kalfountzos on May 5, 2017, 7:02 am

Hello everyone,

I am currently filling in the documents for this particular credit and I get a negative value for...

Baseline system selection

NC-2009 EAp2: Minimum Energy Performance
posted by Charalampos Giannikopoulos on Jun 28, 2016, 9:11 am

For a project that is less than 150,000 ft2 and has 6 floors of which 1 (the basement) is unconditioned would System 6 still be eligible for the project and not System 8? In other words, with...

Last reply: Marcus Sheffer, Jun 29, 2016, 11:44 am

Greenguard

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Charalampos Giannikopoulos on May 25, 2016, 10:25 am

Would a product which is Greenguard gold certified automatically prove compliance with the credit requirements similarly to LEED for Schools?

Last reply: John-David Hutchison, LEED AP BD+C, PMP, May 25, 2016, 11:09 am

RECs for Europe

EBOM-2009 EAc4: On-Site and Off-Site Renewable Energy
posted by Charalampos Giannikopoulos on Apr 30, 2015, 6:24 am

Could you advise of a list of...

Last reply: Ben Stanley, Dec 1, 2015, 5:04 pm

Gravel nonroof area

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Charalampos Giannikopoulos on Nov 20, 2014, 5:21 am

Under what circumstances could a nonroof area covered with light gravel be considered as non-hardscape? This area is a permeable area as it contributes to an effective stormwater management and...

Last reply: Tristan Roberts, Nov 26, 2015, 10:25 pm

Target Index

EBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessment
posted by Charalampos Giannikopoulos on Oct 12, 2015, 9:01 am

Further to a preliminary review of project located outside the U.S. we are asked to provide a summary of findings relating to the generation of the project building site Energy Utilization Index...

Last reply: Dave Hubka, Oct 12, 2015, 10:23 am

10 existing villas project

LEED Rating System Selection
posted by Adamantia Zisopoulou on May 5, 2015, 3:48 am

My project is an existing sea resort complex which consists of 10 villas with kitchens. Which LEED rating system can I use? Do you believe that is better to be certified all the area or one villa...

Last reply: Nadav Malin, Aug 13, 2015, 2:22 pm

Policy goals

EBOM-2009 MRp1: Sustainable Purchasing Policy
posted by Charalampos Giannikopoulos on Jun 22, 2015, 4:03 am

Does a specific goal need to be addressed for the policy or would a prescriptive description of the goal be used such as that “the goal is to, at a minimum, maintain the current environmentally...

Last reply: Karin Miller, Jun 29, 2015, 4:39 pm

Existing Building Flooring Reuse

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Charalampos Giannikopoulos on Dec 18, 2014, 3:30 pm

For an existing building under major renovation would the reused flooring be exempt from the credit requirements and should only new flooring to be installed comply with the requirements in order...

Last reply: Susan Walter, Feb 12, 2015, 9:05 am

No Facility Alterations

EBOM-2009 MRc9: Solid waste management - facility alterations and additions
posted by Charalampos Giannikopoulos on Nov 23, 2014, 6:33 am

Would a project with no facility alterations or additions during the performance period and as result with no relevant waste be still eligible for this credit?

Last reply: Barry Giles, Nov 24, 2014, 12:32 pm