Topic | Recent |
---|---|
Base building versus tenant meteringCS-v4 EAp3: Building-level energy meteringposted by Jens Apel on Jul 18, 2017, 8:52 am
Maybe I am overly cautious, but I would like to clarify the following. The Ref.Guide states "... Last reply: Kristina K, Feb 19, 2021, 10:35 am |
|
ACP- No Cooling Tower (Core & Shell v4)CS-v4 WEc3: Cooling tower water useposted by Anke Koch on Dec 12, 2017, 3:38 am(https://leeduser.buildinggreen.com/forum/acp-no-cooling-tower-core-shell-v4) also confirms my understanding of the interpretation. Log in or register to post comments ... Last reply: Erkki Seinre, Aug 6, 2020, 9:13 am |
|
LEED online Substitution v4.1 for v4 MRC1: Submit 4 Points for Option 4 Path 4?NC-v4.1 MRc1: Building life-cycle impact reductionposted by J Schütz on Mar 20, 2020, 9:02 am
Dear all, as our project meets the requirements of Path 4, we like to submit 4 Points in LEED online. For Option 4 under LEED v4 only 3 Points are available at the thresholds. Is it... Last reply: J Schütz, Aug 5, 2020, 1:49 am |
|
Indoor Air Measurements: required measurement durationEBOM-v4.1 EQp4: Indoor Environmental Quality Performanceposted by Roland Braun on Jun 26, 2020, 5:33 am
Hi to all: Last reply: Roland Braun, Jun 30, 2020, 2:19 pm |
|
Option 2- Strategy F: work surfaces comply but no movable partitions in the projectNC-v4 EQc6: Interior lightingposted by Benjamin Weise on Feb 19, 2020, 2:39 am
We are planning to comply with the strategies A, B, C and F. The strategies A, B and C should not pose a problem. However, I am not sure about strategy F: Work surfaces will be grey-white... Last reply: Kera Lagios, Jun 22, 2020, 9:32 pm |
|
Is tehre a reference as to which costs are to be considered?NC-v4.1 MRc3: Sourcing of Raw Materialsposted by Benjamin Weise on Mar 23, 2020, 3:39 am
Hi, this question is about a project in Germany, so cost estimates might work differently here. We are having difficulties retrieving the material costs from the subcontractors. The... Last reply: Shawn Keith, Jun 4, 2020, 3:27 pm |
|
Number of Lux Measurements in a High Rise Office TowerCS-v4 EQc4: Daylightposted by Christine Recke on May 8, 2020, 8:16 am
In a Core and Shell project Office Tower that is over 50 stories, the rule is still measure all regularly occupied spaces in the building? That could mean over 50 floors of measurements? Or is... Last reply: Daniel Glaser, May 8, 2020, 12:09 pm |
|
Entryway systems for deliveryNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Christine Recke on Jun 24, 2019, 9:34 am
Hi everyone, we have a project that includes a delivery entry, which is only used by the responsible service staff for the delivery operation. To our mind this delivery entrance is... Last reply: Karen Joslin, May 5, 2020, 3:02 pm |
|
Interior Paints and CoatingsNC-v4 EQc2: Low-emitting materialsposted by Reinhard Oppl on Dec 16, 2015, 8:51 am
Who can help to clarify? I am in a discussion with consultants who state that for paints and coatings, wet-applied on-site on walls, floors and ceilings, the... Last reply: Oliver Bate, Mar 30, 2020, 6:07 am |
|
Automatic Receptacle ControlNC-v4 EAp2: Minimum Energy Performanceposted by Jan Hesse on Aug 7, 2015, 6:36 am
ASHRAE 90.1-2010 8.4.2 states, that 50% of all 125 volt 15- and 20-Ampere receptacle outlets in private offcies, open offices and computer classrooms shall be automatically switched off when the... Last reply: Marcus Sheffer, Mar 25, 2020, 11:58 am |