Log in
Forum » Malaysia
Topic

International Project- Case 2 Option 1 or Option 2

EBOM-2009 EAc1: Optimize Energy Efficiency Performance
posted by Sheena Moses on Feb 13, 2017, 8:23 am

Dear all,

The case 2 calculator has pointed us towards using Case 2 - Option 1 for our Existing Retail Mall project located outside of the US. Under this option, the calculator states...

Last reply: Ben Stanley, Aug 29, 2017, 2:19 pm

Building Flush Out Inquiry

EBOM-2009 IEQc1.5: Indoor air quality best management practices - indoor air quality management for facility additions and alterations
posted by Sheena Moses on Aug 23, 2017, 2:54 am

We are currently working on an...

Last reply: Ben Stanley, Aug 29, 2017, 12:01 pm

International Project- Case 2 Option 1 or Option 2

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Sheena Moses on Aug 24, 2017, 1:22 am

Dear all,

We have a retail mall in Malaysia targeting LEED...

Last reply: Ben Stanley, Aug 29, 2017, 11:32 am

ACP for Certified Wood vs Pilot for Legal Wood

General forums
posted by Terrapin BrightGreen on Apr 20, 2017, 5:17 pm

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11470 thumbs up May 4, 2017- 11:36 am Catie, I would suggest posting that question to the specific LEED credit forum that's involved. This forum seems a little quiet now. Log in or register to post comments ...

Last reply: Tristan Roberts, May 4, 2017, 11:36 am

ESVE Requirement

Pilot-Credits LTpc70: Green vehicles
posted by Joshua Chia on Mar 17, 2017, 3:43 am

Hi, hope someone can help clarify whether the requirement for the ESVE to be capable of participating in a demand-response program or...

Modeling DCV Savings for Proposed Building

CS-2009 IEQp1: Minimum indoor air quality performance
posted by Bernard Sagaiyaraj on Apr 15, 2016, 8:04 am

To account savings using DCV, we understand that Baseline building ventilation is to be modeled using ASHRAE 62.1 whereas Proposed building ventilation is to modeled as designed.

However...

Last reply: Michael Brown, Jan 27, 2017, 1:50 pm

Table PIf3-1 Space Usage Type- Owned vs Leased

NC-2009 PIf3: Occupant and Usage Data
posted by Terrapin BrightGreen on Jan 12, 2017, 5:02 pm

Hi could you confirm whether the "Owned/Leased" column is meant to reflect the project owner's usage management versus the building owner's usage? For instance, my client owns the whole building...

Last reply: Summer Minchew, Jan 16, 2017, 9:11 am

Required parking lots and LEED boundary Calculations

CS-2009 MPR3: Must use a reasonable site boundary
posted by kerry wang on May 25, 2016, 10:37 pm

Hi all,
We have a question about LEED boundary calculation as below:

In order to save the land, our company has set up a shared parking lot in the area, so this project does not...

Required parking lots and LEED boundary Calculations

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by kerry wang on May 24, 2016, 11:15 pm

Hi all,
We have a question about LEED boundary calculation as below:

In order to save the land, our company has set up a shared parking lot in the area, so this project does not have...

Natural ventilation for residential

CS-2009 IEQp1: Minimum indoor air quality performance
posted by mai elly on Jan 21, 2015, 3:06 am

HI,
The client requesting to have DX air conditioning system for each space in the building. My questions:

1. Could I use the sliding door as operable wall/window to supply the fresh...

Last reply: Michael Brown, Dec 10, 2015, 10:01 am