Log in
Forum » Malaysia
Topic

Required parking lots and LEED boundary Calculations

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by kerry wang on May 24, 2016, 11:15 pm

Hi all,
We have a question about LEED boundary calculation as below:

In order to save the land, our company has set up a shared parking lot in the area, so this project does not have...

Natural ventilation for residential

CS-2009 IEQp1: Minimum indoor air quality performance
posted by mai elly on Jan 21, 2015, 3:06 am

HI,
The client requesting to have DX air conditioning system for each space in the building. My questions:

1. Could I use the sliding door as operable wall/window to supply the fresh...

Last reply: Michael Brown, Dec 10, 2015, 10:01 am

Accidentally Opened Awarded Credit during Appeal Stage

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Bernard Sagaiyaraj on Aug 12, 2015, 5:19 am

My team member accidentally opened 2 awarded credits during the Appeal Stage for some other non-compliance credits. No changes were made to the form. Can we appeal to...

Last reply: Marcus Sheffer, Aug 25, 2015, 9:06 am

HVAC System 8 Baseline

CS-2009 EAp2: Minimum Energy Performance
posted by CINDY CHAI on Mar 18, 2015, 10:53 am

Hi all,

Currently I have a project in Malaysia that is going for LEED Core and Shell (2009), the project consists of multiple buildings but will be certified under one certificate. The...

Last reply: Marcus Sheffer, Mar 25, 2015, 8:39 pm

Mechanical Ventilation using local code

NC-2009 IEQp1: Minimum indoor air quality performance
posted by MOHD HAFIZI MOHAMAD on Jan 20, 2015, 11:03 pm

Hi.

Is it a compulsory to design mechanical ventilation by using local code even if ASHRAE Standard is more stringent in order to score IEQ Credit 2: Increased Ventilation?

I got a...

Last reply: MOHD HAFIZI MOHAMAD, Jan 21, 2015, 9:37 pm