Topic | Recent |
---|---|
Hazard identify for the project outside of the USPilot-Credits IPpc98: Assessment and planning for resilienceposted by Junko Miyamoto on Jul 8, 2020, 3:29 am
Hi all, There is no hazard risk disclosure of Wildfire, Drought and Landslides and Unstable Soils in the project site. Because Japan where is the project site has no experience in those... |
|
VRV that controls laboratory ambient temperature should be classified as HVAC system or processNC-v4 EAp2: Minimum Energy Performanceposted by SOLON YANG on Jul 10, 2018, 2:39 am
I encountered this situation when building the energy model: the laboratory's ambient temperature control was provided by VRV, which was closed, mainly for equipment testing, and the personnel... Last reply: Marcus Sheffer, Jul 20, 2018, 10:51 am |
|
Diverse uses- Shops in a shopping mall as tenantsCI-v4 LTc2: Surrounding density and diverse usesposted by Megumi Horii on Jul 12, 2018, 9:38 pm
Can shops in a shopping mall as tenants be counted seperately or as "several shops in 1 shopping mall = 1 shop"? I am asking this question because it may be linked to the credit language "A use... Last reply: Megumi Horii, Jul 16, 2018, 8:48 pm |
|
Cooling Tower drift eliminator- standards for processesNC-v4 WEp2: Indoor water use reductionposted by Dionisio Franca on Jul 13, 2018, 5:45 am
We checked the drift eliminator specs with the manufacturer selected for our project and they told us that that their draft eliminators reduce drift to 0.05% only. Has anyone experienced this... |
|
Quick EV chargerNC-v4 LTc8: Green vehiclesposted by Noriko Nagazumi on Aug 2, 2017, 4:48 am
Hello, We understand that EV charger with capacity to make a car full charged in 8 hours could be counted as one under v2009, so quick charger which has capacity of charging a car to full... Last reply: Noriko Nagazumi, Jul 2, 2018, 1:20 am |
|
4VOC certificationCI-v4 EQc2: Low-emitting materialsposted by DAVE LI on Jun 13, 2018, 5:45 am
Japan has a Third Party certification called 4... |
|
What is the base building service water?CI-v4 EAc3: Advanced Energy Meteringposted by JASON NIEN on Feb 26, 2018, 9:07 pm
In the LEED CI V4 standard. Base building service water heating does not need to be metered.So someone can tell me what kind of use belongs to... Last reply: Paula Melton, Mar 8, 2018, 11:50 am |
|
LEED ND v4 MPR2 project areaND-v4 MPR2: Must use reasonable LEED boundariesposted by wenting ding on Feb 18, 2018, 11:13 pm
Hi, In the MPR of LEED ND, it is written'Projects may have enclaves of non-project properties that are not subject to the rating system, but cannot exceed 2% of the total project area and... Last reply: wenting ding, Feb 20, 2018, 7:24 pm |
|
LEED ND v4 MPR2 project areaND-v4 MPR2: Must use reasonable LEED boundariesposted by wenting ding on Feb 18, 2018, 8:04 pm
We are considering applying for a LEED ND cergification. In the minimum program requirements, it is writter'projects may have enclaves of non-project properties that are not subject to the rating... |
|
Fixtures outside the project scopeCI-v4 WEc1: Indoor water use reductionposted by Takayuki Hirota on Aug 8, 2017, 3:43 am
Our office project will occupy two floors of a newly constructed building and the building owner will provide all water fixtures including water closets, lavatory faucets and kitchen faucets. Any... Last reply: Takayuki Hirota, Aug 27, 2017, 9:32 pm |