LED Wall washer calculation

LEED v4.1 Discussion Forum
posted by Martina Vázquez on Feb 1, 2023, 6:35 am

Good morning,

I've been studing LEED v4.1 document and it is almost all of it for streetlight projects, but we have a proposal based in wall-washer the exterior facade. I don't really know...

System 2 as the baseline system for the whole project

NC-v4 EAp2: Minimum Energy Performance
posted by Amal Venugopal on Jan 21, 2023, 8:29 pm

We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. Greetings!...

We have a question regarding the...

Last reply: Marcus Sheffer, Jan 27, 2023, 2:01 pm

Resort: Baseline HVAC

NC-v4 EAc2: Optimize Energy Performance
posted by Amal Venugopal on Jan 23, 2023, 3:07 am

 Greetings!...

We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA.

We have a question...

Last reply: Marcus Sheffer, Jan 27, 2023, 2:00 pm

Commingled Waste approach in storage locations for recyclable materials

EBOM-v4.1 MRp3: Waste Performance
posted by Maysoon Al-Khuraissat on Sep 20, 2022, 9:59 am

I'm working on a huge existing Mall, Is the...

Artificial turf in Steep-sloped roof

NC-v4.1 SSc5: Heat Island Reduction
posted by weam baljoon on Sep 19, 2022, 9:18 am

Can anyone clarify for NC-v4.1 SSc5 Option 1 Roof and Non-Roof - if Steep-sloped roof is covered with Artificial turf (decretive finish) and the product is within the minimum solar reflectance...

PV Solar Panels outside LEED Boundary

NC-2009 EAc2: On-Site Renewable Energy
posted by Ammar Yahia on Aug 25, 2022, 3:56 am

A New Construction Project in which the PV panels to be installed on a "330,000 SQM roof of an airport terminal building project"  to offset 22% of annual energy cost.

Is it possible to...

Last reply: Marcus Sheffer, Aug 25, 2022, 8:50 am

Prefabricated or modular structure Buildings

NC-v4 MPR1: Must be in a permanent location on existing land
posted by VISHAL JAIN on Aug 17, 2022, 8:53 am

Hello,

Would like to know more details on how "Prefabricated or modular...

Decorative lighting fixtures

NC-v4.1 EQc6: Interior lighting
posted by Ellis John Mandia on Aug 9, 2022, 6:32 am

Are decorative lighting fixtures such as chandeliers, wall sconces, and table lamps, that are within regularly occupied space included in the requirements to comply with luminance of less than 2,...

Last reply: Glenn Heinmiller, Aug 9, 2022, 11:50 am

Are substations registered within a LEED project?

LEED Guidance for Campuses and Multiple Buildings
posted by Dalia Abdalla on Jul 28, 2022, 2:09 am

Do we need to register substations within a project as separate buildings (Under Group Approach) ?  If yes, do we have to consider them for analysis under each credit. They don't have any GFA. ...

Advanced Energy Metering Owner & Tenant spaces

CS-v4 EAc3: Advanced Energy Metering
posted by Aishwarya Chengappa on Jul 20, 2022, 2:24 am

I have a G+6F C&S office building with 2 office spaces in each floor, which will be metered separately as per the local law. Although the owner of the building will be accommodating one of...

Last reply: Marcus Sheffer, Jul 22, 2022, 11:17 am