Baseline for unconditioned buildingNC-v4 EAp2: Minimum Energy Performanceposted by Amgad Khattab on Aug 21, 2024, 2:43 am
we have a dormitory building with mechanical ventilation (treated with cooling to reach 20 C and a CAV reheat terminal ) only associated with ceiling fans, shall we model the baseline with no... Last reply: Marcus Sheffer, Aug 21, 2024, 10:49 am |
|
Modeling of Steam Humidifiers in the BaselineNC-v4 EAc2: Optimize Energy Performanceposted by Hanin Hamdan on Jul 26, 2024, 2:32 am
Hi, I am working on a Mixed Hotel Project with Amenities and Residences in a Hot and Dry Climate, Zone 1B. The Fresh AHUs (with Energy Recovery Wheels) are equipped with a A Steam... Last reply: Marcus Sheffer, Aug 2, 2024, 6:01 pm |
|
Baseline Calculation & AHU CondensatePilot-Credits WEpc115: Whole Project Water Use Reductionposted by Kim C on Jul 21, 2024, 10:50 am
The project is an industrial facility with it's own wastewater treatment system. 1) Do we claim all the reused process water under Row82 Non-... Last reply: Alison Rosso, Jul 23, 2024, 6:07 pm |
|
Office kitchen to be considered as regularly occupied space for Daylight AnalysisNC-v4 EQc7: Daylightposted by Rajat Kumar on Jul 19, 2024, 7:20 am
We are working on a project involving an office building with a kitchen with a total area of 50 square meters. We don |
|
BUS SERVICES PROVIDED BY SCHOOL TO MEET QUALITY TRANSIT REQUIREMENTSchools-NC-v4.1 LTc5: Access to quality transitposted by Amal Venugopal on Nov 3, 2022, 2:20 am
The query is for a school project which is in a location with no bus or any other mode of transporation within LEED proximity range , to meet the Quality transit credit, Opt1. Transit served... Last reply: , Jul 18, 2024, 11:08 am |
|
U value compliance for Revolving DoorsNC-v4 EAp2: Minimum Energy Performanceposted by Alokmay Behera on Oct 23, 2023, 4:37 am
I am working on a LEED project with revolving doors. The targetted U value for glaze is 1.9 W/Sqft.K (including frames),... Last reply: Afogreen Build, Jul 9, 2024, 1:04 am |
|
Ecology Unit in Mechanical DesignNC-v4.1 EAp2: Minimum Energy Performanceposted by Mu'ath Ad on Jul 4, 2024, 9:22 am5903 thumbs up July 5, 2024- 10:30 am Your question is not appropriate for this particular forum. From an energy perspective such an air cleaning device would be considered a process load and simply... Last reply: Marcus Sheffer, Jul 5, 2024, 11:24 am |
|
If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awarNC-v4 WEc1: Outdoor water use reductionposted by Nandan Tavkar on Jun 19, 2024, 5:39 am
If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awarded as 100% reduction (2 points)? Please confirm Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:40 am |
|
Recycled Content Report (Post-Consumer & PreConsumer)NC-v4.1 MRc3: Sourcing of Raw Materialsposted by Mu'ath Ad on Jun 7, 2024, 2:02 pm
Hi, in my current project I am dealing with a manufacturer who provided the Recycled Content with percentage report with mention whether is post-consumer or pre-consumer for some reasons. ... Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:34 am |
|
Proposal to update the LEED New construction registration to LEED Core and Shell in the construction phaseLEED Rating System Selectionposted by Alokmay Behera on Jun 4, 2024, 3:47 am
Greetings. I am working on a project with 8 mid-rise buildings, each of them targetting LEED Platinum under New Construction (NC)- Version 4. However, during construction, one of the... Last reply: Alokmay Behera, Jun 10, 2024, 1:55 am |