LED Wall washer calculationLEED v4.1 Discussion Forumposted by Martina Vázquez on Feb 1, 2023, 6:35 am
Good morning, I've been studing LEED v4.1 document and it is almost all of it for streetlight projects, but we have a proposal based in wall-washer the exterior facade. I don't really know... |
|
System 2 as the baseline system for the whole projectNC-v4 EAp2: Minimum Energy Performanceposted by Amal Venugopal on Jan 21, 2023, 8:29 pm
We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. Greetings!... We have a question regarding the... Last reply: Marcus Sheffer, Jan 27, 2023, 2:01 pm |
|
Resort: Baseline HVACNC-v4 EAc2: Optimize Energy Performanceposted by Amal Venugopal on Jan 23, 2023, 3:07 am
Greetings!... We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. We have a question... Last reply: Marcus Sheffer, Jan 27, 2023, 2:00 pm |
|
Commingled Waste approach in storage locations for recyclable materialsEBOM-v4.1 MRp3: Waste Performanceposted by Maysoon Al-Khuraissat on Sep 20, 2022, 9:59 am
I'm working on a huge existing Mall, Is the... |
|
Artificial turf in Steep-sloped roofNC-v4.1 SSc5: Heat Island Reductionposted by weam baljoon on Sep 19, 2022, 9:18 am
Can anyone clarify for NC-v4.1 SSc5 Option 1 Roof and Non-Roof - if Steep-sloped roof is covered with Artificial turf (decretive finish) and the product is within the minimum solar reflectance... |
|
PV Solar Panels outside LEED BoundaryNC-2009 EAc2: On-Site Renewable Energyposted by Ammar Yahia on Aug 25, 2022, 3:56 am
A New Construction Project in which the PV panels to be installed on a "330,000 SQM roof of an airport terminal building project" to offset 22% of annual energy cost. Is it possible to... Last reply: Marcus Sheffer, Aug 25, 2022, 8:50 am |
|
Prefabricated or modular structure BuildingsNC-v4 MPR1: Must be in a permanent location on existing landposted by VISHAL JAIN on Aug 17, 2022, 8:53 am
Hello, Would like to know more details on how "Prefabricated or modular... |
|
Decorative lighting fixturesNC-v4.1 EQc6: Interior lightingposted by Ellis John Mandia on Aug 9, 2022, 6:32 am
Are decorative lighting fixtures such as chandeliers, wall sconces, and table lamps, that are within regularly occupied space included in the requirements to comply with luminance of less than 2,... Last reply: Glenn Heinmiller, Aug 9, 2022, 11:50 am |
|
Are substations registered within a LEED project?LEED Guidance for Campuses and Multiple Buildingsposted by Dalia Abdalla on Jul 28, 2022, 2:09 am
Do we need to register substations within a project as separate buildings (Under Group Approach) ? If yes, do we have to consider them for analysis under each credit. They don't have any GFA. ... |
|
Advanced Energy Metering Owner & Tenant spacesCS-v4 EAc3: Advanced Energy Meteringposted by Aishwarya Chengappa on Jul 20, 2022, 2:24 am
I have a G+6F C&S office building with 2 office spaces in each floor, which will be metered separately as per the local law. Although the owner of the building will be accommodating one of... Last reply: Marcus Sheffer, Jul 22, 2022, 11:17 am |