Option 2 (prescriptive path) documentation?NC-v4 EAp2: Minimum Energy Performanceposted by Erica Downs on Aug 19, 2024, 2:36 pm
I have a project attempting EAp2/c2 via the prescriptive pathway, Option 2, 50% AEDG. The only "required documentation" listed in the Reference Guide is the completed AEDG tables, which seems... Last reply: Marcus Sheffer, Aug 28, 2024, 3:34 pm |
|
Sub-Metering for small service buildingsNC-v4 EAc3: Advanced Energy Meteringposted by Cyle Sheppard on Aug 20, 2024, 3:36 pm
I have a question from our Electrical Engineer that I am unsure on. Our building has several small service buildings at the rear of the property. We understand that we need to include... Last reply: Marcus Sheffer, Aug 28, 2024, 3:31 pm |
|
Plug Load ExemptionNC-2009 EAp2: Minimum Energy Performanceposted by Kim Lombard on Apr 23, 2015, 2:07 pminsight and comments. I very much appreciate this forum as a place where we can ask the questions concerning our project, even when the questions aren't popular ones. Like most projects this one has... Last reply: Marcus Sheffer, Aug 28, 2024, 3:20 pm |
|
Recycled content for different concrete mixesNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Saif Ahmed Mohammed on Aug 21, 2024, 1:10 pm
Hi all, We are using different types of concrete (Different strength, differrent additives), the... Last reply: Laura Soma, Aug 21, 2024, 1:18 pm |
|
Calculator Protected sheet v4 1_Bldg products calculator_v04NC-v4.1 MRc2: Environmental Product Declarationsposted by Allison Para on Feb 16, 2024, 4:35 pm
Hello LEED Experts, Please help me with the v4.1 Calculator for (MR) Building products calculator. I am unable to make any changes or edits. I am... Last reply: Harry Flamm, Aug 20, 2024, 5:34 pm |
|
IPpc90 Social Equity within the Project Team- Option 1Pilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Atlas Turner on Aug 19, 2024, 2:25 pm
Greetings All, This innovation credit has proven highly beneficial for projects funded by local, state, or federal governments. Such projects often need to comply with the Federal Davis-... |
|
LEED MR Credits and Division 13LEED v4.1 Discussion Forumposted by Ralph Bicknese on Aug 19, 2024, 2:12 pm
We are working on a LEED B+C (non healthcare) project that has a clean room and trying to determine whether or not the clean room "unit"/prefab wall panel systems and ceiling panel systems should... |
|
Documentation for VOC content requirementNC-v4.1 EQc2: Low-emitting materialsposted by Nadia Azzam on Mar 31, 2023, 11:52 am
Is a letter from the manufacturer sufficient to satisfy documentation for the... Last reply: Lauren Richardson, Aug 16, 2024, 7:54 am |
|
Extended Producer Responsibility programNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Tracy Marquis on Aug 9, 2024, 2:17 pm
I am hoping to start a list of manufacturers with Extended Producer Responsibility Programs (EPRs) that meet the LEED V4.1 criteria. We are stuggling to achieve 2 points through... |
|
Option 1 Lighting Control- Undeveloped Future Tenant SpacesNC-v4 EQc6: Interior lightingposted by James Keohane on May 25, 2018, 5:13 pm
I am working on a project that has the majority of individual occupant spaces that will be completely finished with lighting controls meeting the requirements for Option 1. However, we also have... Last reply: Joyce Kelly, Aug 9, 2024, 9:13 am |