Topic | Recent |
---|---|
Vertical fenestration for Proposed CaseNC-2009 EAp2: Minimum Energy Performanceposted by Billy Condor on Jan 26, 2017, 1:14 pm
Hello, I'm evaluating the energy efficiency of a building that has almost 100% of curtainwall, however the architect says that his project has high beams height (the ones attached to the... Last reply: Marcus Sheffer, Jan 27, 2017, 12:41 pm |
|
Scope of system performance testingCI-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Billy Condor on Jan 26, 2017, 2:11 pm
I have two questions regarding... Last reply: Scott Bowman, Jan 26, 2017, 4:07 pm |
|
Outdoor Air Delivery Monitoring System for LEED CS buildingCI-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Ron Dean on May 5, 2016, 12:41 pm
We have a leased office in a LEED C&S project. As a part of the C&S scope, the building has two centrifugal fan boxes that supply 100% outdoor air to the offices through a masonry duct,... Last reply: Tristan Roberts, Jan 18, 2017, 12:33 am |
|
Building Level Water MeteringEBOM-v4 WEp2: Building-level water meteringposted by sebastian castañeda on Jan 16, 2017, 3:03 pm
I have a doubt, we have a project of a complex of 3 buildings that is located inside a University Campus. In this Campus there are 2 global water meters with their respective monthly receipts... Last reply: Trista Brown, Jan 17, 2017, 4:35 pm |
|
ESC Plan equivalentNC-2009 SSp1: Construction Activity Pollution Preventionposted by Vanessa Montezuma Ramos on Jan 2, 2017, 8:46 pm
Hi, we have some doubts about the equivalency of the... Last reply: James Wilson, Jan 8, 2017, 12:47 pm |
|
Proper Pedestrian Accesss to Basic ServicesCS-2009 SSc2: Development Density and Community Connectivityposted by Jimena Etchegaray on Nov 29, 2016, 1:09 pm
We are certifying a project in a semi rural area. Although we have identified 10 basic services, the reviewers have questioned the pedestrian access to these areas. Specifically, they requested... Last reply: Jimena Etchegaray, Nov 29, 2016, 6:03 pm |
|
Inconsistent Price Square Meters versus Square FeetPilot-Credits SSpc83: Offsite Financial Support for Habitat Protectionposted by Ben Stanley on Nov 2, 2016, 12:36 pm
We're pursuing this pilot credit for an... |
|
supplier and products UFNC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Jose Antonio Kovacevic on Sep 20, 2016, 4:37 pm
To comply with IEQc4.4 credit in LEED NC |
|
Registration by Owner or Consultant?NC-2009 PIf2: Project Summary Detailsposted by Vanessa Montezuma Ramos on Sep 13, 2016, 6:50 pmJon Clifford LEED-AP BD+C GREENSQUARE LEEDuser Expert 321 thumbs up September 13, 2016- 10:17 pm Monica—The best forum for your question is probably http://www.leeduser.com/topic/leed-reviews-leed-online-appeals-designcon.... Also see USGBC’s Certification Guides at http://www.usgbc.org/cert-guide, which outlines the registration process, explains the roles of the various parties, and describes how the project owner can assign the project administrator role to a consultant or other team member. Log in or register to post comments ... Last reply: Jon Clifford, Sep 13, 2016, 10:17 pm |
|
Service water heating for electric water heatersNC-2009 EAp2: Minimum Energy Performanceposted by Billy Condor on Aug 18, 2016, 6:47 pm
Hello everyone, 1. Do the insulation requeriment of service water heating pipes (section 7.4.3 and table 6.8.3) apply for any material? The plumbing designer said that CPVP pipes don't... Last reply: Jean Marais, Aug 22, 2016, 3:16 am |