Log in
Forum » Argentina
Topic

International project- no Green-e certified energy

NC-2009 EAc6: Green Power
posted by Victoria Rios Esteve on Jun 30, 2021, 11:57 pm

Hi everyone! 

We are working on a LEED BD+C NC2009 certification of a project based in Buenos Aires. Our client owns an off-site...

Last reply: Marcus Sheffer, Jul 1, 2021, 7:28 pm

Concrete in ROOF- SRI

NC-v4 SSc5: Heat Island Reduction
posted by Victoria Rios Esteve on May 14, 2021, 8:39 am

emily reese moody Sustainability Director, Certifications & Compliance Jacobs LEEDuser Expert 487 thumbs up May 21, 2021- 12:34 am Just so that this question doesn't look empty, there was a response provided here:  https://leeduser.buildinggreen.com/forum/sri-value-concrete  That said, if anyone else has different (or better) insight, please do respond! Log in or register to post comments...

Last reply: emily reese moody, May 31, 2021, 7:48 pm

Building Footprint in mixed used building

NC-2009 PIf2: Project Summary Details
posted by Victoria Rios Esteve on May 17, 2021, 3:47 am

Hi everyone, 

We are working on one building that has 2 different programmes. But, only one is going under LEED certification. That means that in GF both programmes appear, but with clear...

Last reply: Deborah Lucking, May 17, 2021, 11:37 pm

Soils in green roofs

NC-v4.1 SSc2: Protect or Restore Habitat
posted by Alexia Anastassiadis on May 17, 2021, 9:52 am

Hi! Our project has a...

Solar Panels

NC-2009 EAc2: On-Site Renewable Energy
posted by Paula Hernandez on Jan 9, 2017, 8:35 am

Hello,
I am working on a Project that wants to claim all the available points on EA-c2. But they don´t have the space needed to place all the solar panels inside the LEED boundary.
...

Last reply: Marcus Sheffer, Feb 16, 2021, 5:09 pm

Naturally Ventilated Warehouse

CS-v4 EQp1: Minimum indoor air quality performance
posted by Micaela Smulevich on Jan 28, 2021, 3:38 pm

We are currently working on incorporating sufficient strategies to naturally ventilate an industrial warehouse. Due to the dimensions of the warehouse it is not possible to consider all surface...

Last reply: Andrew Mitchell, P.E., Jan 28, 2021, 4:33 pm

Need more info on v4.1 Integrative Process credit

NC-v4.1 IPc1: Integrative process
posted by Victoria Rios Esteve on Jan 7, 2021, 11:16 am

Hi everyone! We are working on the certificacion of a major renovation building. We are willing to get this IP credit but have some doubts. 1) What are the differences between v4 and v4.1 version...

Last reply: Marcus Sheffer, Jan 8, 2021, 1:21 pm

Aerator with no WaterSense label

NC-v4 WEp2: Indoor water use reduction
posted by Victoria Rios Esteve on May 18, 2020, 3:48 pm

Hi everyone, 

We are having a problem with the requirements of WEp2. For a public faucet, LEEDs baseline for flow rate is 1.9 lpm. Here, in Argentina, the lowest flow rate faucet available...

Last reply: Sara BENLOUBA, Nov 24, 2020, 9:54 am

Minisplit Efficiency

NC-2009 EAp2: Minimum Energy Performance
posted by Paula Hernandez on Sep 28, 2020, 1:49 pm

Hi,

I am Certifiying an office attached to a wharehouse. The office counts with minisplit units, but I am not able to find a minisplit brand that will comply with minimum COPs shown in...

Last reply: Paula Hernandez, Sep 30, 2020, 9:53 am

Minisplit Efficiency

NC-2009 EAp2: Minimum Energy Performance
posted by Paula Hernandez on Sep 28, 2020, 2:16 pm

Hi

I am certifiying an office building, a very small one, attached to a wharehouse.

The office building counts with minisplit systmes, but I cannot find in the market minisplits...

Last reply: Paula Hernandez, Sep 30, 2020, 9:50 am