Topic | Recent |
---|---|
Naturally Ventilated WarehouseCS-v4 EQp1: Minimum indoor air quality performanceposted by Micaela Smulevich on Jan 28, 2021, 3:38 pm
We are currently working on incorporating sufficient strategies to naturally ventilate an industrial warehouse. Due to the dimensions of the warehouse it is not possible to consider all surface... Last reply: Andrew Mitchell, P.E., Jan 28, 2021, 4:33 pm |
|
Need more info on v4.1 Integrative Process creditNC-v4.1 IPc1: Integrative processposted by Victoria Rios Esteve on Jan 7, 2021, 11:16 am
Hi everyone! We are working on the certificacion of a major renovation building. We are willing to get this IP credit but have some doubts. 1) What are the differences between v4 and v4.1 version... Last reply: Marcus Sheffer, Jan 8, 2021, 1:21 pm |
|
Aerator with no WaterSense labelNC-v4 WEp2: Indoor water use reductionposted by Victoria Rios Esteve on May 18, 2020, 3:48 pm
Hi everyone, We are having a problem with the requirements of WEp2. For a public faucet, LEEDs baseline for flow rate is 1.9 lpm. Here, in Argentina, the lowest flow rate faucet available... Last reply: Sara BENLOUBA, Nov 24, 2020, 9:54 am |
|
Minisplit EfficiencyNC-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Sep 28, 2020, 1:49 pm
Hi, I am Certifiying an office attached to a wharehouse. The office counts with minisplit units, but I am not able to find a minisplit brand that will comply with minimum COPs shown in... Last reply: Paula Hernandez, Sep 30, 2020, 9:53 am |
|
Minisplit EfficiencyNC-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Sep 28, 2020, 2:16 pm
Hi I am certifiying an office building, a very small one, attached to a wharehouse. The office building counts with minisplit systmes, but I cannot find in the market minisplits... Last reply: Paula Hernandez, Sep 30, 2020, 9:50 am |
|
Minisplit EfficiencyNC-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Sep 28, 2020, 1:58 pm
Hi I am certifiying an office building, a very small one, attached to a wharehouse. The office building counts with minisplit systmes, but I cannot find in the market minisplits... |
|
Required documentation for submittalPilot-Credits SSpc129: Comprehensive Compostingposted by Victoria Rios Esteve on Feb 6, 2020, 9:22 am
Hi everyone, We are willing to attempt to this pilot credit but in de Submittals section at the Language tab, it says: "See guide tab for documentation requirements and guidance". And... Last reply: Deborah Stadler, Sep 3, 2020, 9:09 am |
|
Occupancy before building is finishedNC-2009 PIf4: Schedule and Overview Documentsposted by Victoria Rios Esteve on Jun 26, 2020, 11:51 am
Hi everyone! Im pretty sure this question is not rightly set in this category, but here we go... We are working with a building that will be certified under v2009. The building is almost... Last reply: Summer Minchew, Jul 3, 2020, 9:29 am |
|
MInisplit UnitsNC-v4 EQp1: Minimum indoor air quality performanceposted by Paula Hernandez on Sep 7, 2017, 12:44 pm
Hi, I would like to know if minisplit (non-ducted) units have to comply with Standard 62.1-2010, Section 5.8, "...p0articulate filters or air cleaners with a minimum efficiency reporting value... Last reply: Dionisio Franca, Jun 27, 2020, 1:51 am |
|
Economizer for VRF and other systems as per ASHRAE 90.1-2010 requirementNC-v4 EAc2: Optimize Energy Performanceposted by Micaela Smulevich on May 12, 2020, 2:58 pm
when working With Roof Tops machines and commercial split system or water chiller with air handling units I consider the economizer is required as per ASHRAE section 6.5.1, is this correct? ... Last reply: Marcus Sheffer, May 14, 2020, 12:49 pm |