Option 3 flexible lighting control system required documentation

CI-v4 MRc2: Interiors life-cycle impact reduction
posted by Alara Brinton on Dec 21, 2017, 11:30 am

I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system. The form says to "provide a lighting schedule and calculations...

Last reply: Izabela Kwiecinska, Sep 26, 2019, 5:21 am

Using Schools option 2- Pedestrian Access for a Community Service Center

NC-v4 LTc4: Surrounding density and diverse uses
posted by nancy picard on Sep 23, 2019, 1:16 pm

Has anyone ever seen new construction projects where an exception was made for them to use Schools option 2  - Pedestrian Access even if applying for another type pf building? In my case, the...

Last reply: Kara Strong, Sep 25, 2019, 10:28 am

Re-used Furniture Eligible for Local Multiplier?

Healthcare-v4 MRc7: Furniture and medical furnishings
posted by Tyler Fenton on Sep 20, 2019, 2:24 pm

Hello,

We're working on a LEED v4 Healthcare project that is pursuing the Furniture credit and I'm wondering if re-used furniture would be eligible for the local multiplier of 200% its...

Exemption of Tenant Space

NC-2009 EAp2: Minimum Energy Performance
posted by Sandra Lester on Aug 28, 2019, 4:17 pm

We are working on a project that is primarily a nursing home but there is a tenant space on the ground floor that is about 15% of the building. The tenant is required to put in their own HVAC...

Last reply: Marcus Sheffer, Aug 28, 2019, 5:19 pm

APPA Room Type Definitions

EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessment
posted by Alexis Doyle on Aug 9, 2019, 1:00 pm

Hello,

We are working on a building recertification to...

Last reply: Alexis Doyle, Aug 15, 2019, 12:40 pm

Envelope CxA within the engineering company part of design team?

NC-v4 EAc1: Enhanced Commissioning
posted by Erika Roy on Apr 23, 2019, 1:59 pm

Hello,

We want to use a building envelope...

Last reply: Scott Bowman, Aug 11, 2019, 6:09 pm

BOD review from the BECx consultant

NC-v4 EAc1: Enhanced Commissioning
posted by Julie Trottier on Jun 4, 2019, 11:44 am

Good Morning,

In order to pursue the EAc1 option 2 , we are the building envelope...

Last reply: Scott Bowman, Aug 11, 2019, 6:01 pm

LEED V4.1 EBO+M Minimum Program Requirements

LEED v4.1 Discussion Forum
posted by Ben McEwen on Aug 7, 2019, 11:57 am

I cannot verify that LEED V4.1 EBO+M requires fulfillment of the usual MPRs that have been required for previous versions (permanent location, site boundaries, etc.). V4 does use these MPRs for...

option 2- Is Land donation acceptable as alternate?

NC-v4 SSc2: Site development - protect or restore habitat
posted by Navisa Jain on Nov 9, 2018, 2:25 pm

Hi,

Does land donated to a national entity for conservation qualify instead of financial support? 

Last reply: Trista Brown, Jul 28, 2019, 9:31 pm

Systems Narrative Template

EBOM-v4.1 EAp1: Energy Efficiency Best Management Practices
posted by Ben McEwen on Jul 19, 2019, 2:35 pm

Hi,

I'm wondering if I can use the same BAS System Narrative Template from V2009 for V4.1?

Thanks,

Ben

Last reply: Dave Hubka, Jul 20, 2019, 8:53 am