Topic | Recent |
---|---|
Option 3 flexible lighting control system required documentationCI-v4 MRc2: Interiors life-cycle impact reductionposted by Alara Brinton on Dec 21, 2017, 11:30 am
I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system. The form says to "provide a lighting schedule and calculations... Last reply: Izabela Kwiecinska, Sep 26, 2019, 5:21 am |
|
Using Schools option 2- Pedestrian Access for a Community Service CenterNC-v4 LTc4: Surrounding density and diverse usesposted by nancy picard on Sep 23, 2019, 1:16 pm
Has anyone ever seen new construction projects where an exception was made for them to use Schools option 2 - Pedestrian Access even if applying for another type pf building? In my case, the... Last reply: Kara Strong, Sep 25, 2019, 10:28 am |
|
Re-used Furniture Eligible for Local Multiplier?Healthcare-v4 MRc7: Furniture and medical furnishingsposted by Tyler Fenton on Sep 20, 2019, 2:24 pm
Hello, We're working on a LEED v4 Healthcare project that is pursuing the Furniture credit and I'm wondering if re-used furniture would be eligible for the local multiplier of 200% its... |
|
Exemption of Tenant SpaceNC-2009 EAp2: Minimum Energy Performanceposted by Sandra Lester on Aug 28, 2019, 4:17 pm
We are working on a project that is primarily a nursing home but there is a tenant space on the ground floor that is about 15% of the building. The tenant is required to put in their own HVAC... Last reply: Marcus Sheffer, Aug 28, 2019, 5:19 pm |
|
APPA Room Type DefinitionsEBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessmentposted by Alexis Doyle on Aug 9, 2019, 1:00 pm
Hello, We are working on a building recertification to... Last reply: Alexis Doyle, Aug 15, 2019, 12:40 pm |
|
Envelope CxA within the engineering company part of design team?NC-v4 EAc1: Enhanced Commissioningposted by Erika Roy on Apr 23, 2019, 1:59 pm
Hello, We want to use a building envelope... Last reply: Scott Bowman, Aug 11, 2019, 6:09 pm |
|
BOD review from the BECx consultantNC-v4 EAc1: Enhanced Commissioningposted by Julie Trottier on Jun 4, 2019, 11:44 am
Good Morning, In order to pursue the EAc1 option 2 , we are the building envelope... Last reply: Scott Bowman, Aug 11, 2019, 6:01 pm |
|
LEED V4.1 EBO+M Minimum Program RequirementsLEED v4.1 Discussion Forumposted by Ben McEwen on Aug 7, 2019, 11:57 am
I cannot verify that LEED V4.1 EBO+M requires fulfillment of the usual MPRs that have been required for previous versions (permanent location, site boundaries, etc.). V4 does use these MPRs for... |
|
option 2- Is Land donation acceptable as alternate?NC-v4 SSc2: Site development - protect or restore habitatposted by Navisa Jain on Nov 9, 2018, 2:25 pm
Hi, Does land donated to a national entity for conservation qualify instead of financial support? Last reply: Trista Brown, Jul 28, 2019, 9:31 pm |
|
Systems Narrative TemplateEBOM-v4.1 EAp1: Energy Efficiency Best Management Practicesposted by Ben McEwen on Jul 19, 2019, 2:35 pm
Hi, I'm wondering if I can use the same BAS System Narrative Template from V2009 for V4.1? Thanks, Ben Last reply: Dave Hubka, Jul 20, 2019, 8:53 am |