2-year contract from what time?NC-2009 EAc6: Green Powerposted by Maria Porter on Nov 2, 2017, 7:31 am
I can find no evidence that the 2-year period needs to start as soon as the building is finished, is that the case? I have one project that wants to wait for about 3-6 months for all... Last reply: Kristina Bach, Nov 2, 2017, 8:39 am |
|
No cooling tower- District coolingNC-v4 WEc3: Cooling tower water useposted by Martina Salonen on Aug 23, 2017, 8:16 am
Hello! We have project which would be applicable for the 'no cooling tower' alternative compliance credit. However, the client is now considering connection to the district cooling system. Do I... Last reply: Martina Salonen, Oct 31, 2017, 4:56 am |
|
Non Roof onlyCS-v4 SSc5: Heat Island Reductionposted by Salam Salman on Aug 16, 2017, 11:40 am
We are targeting option 1: Roof and Nonroof for our project. Last reply: Summer Minchew, Oct 25, 2017, 9:13 pm |
|
Managing rainwater in clay soil with low permeabilityCS-v4 SSc4: Rainwater managementposted by Maria Glädt on Aug 17, 2016, 9:26 am
Hi, Our project site is a landfill area which was used as a parking during the construction of a tunnel located nearby. The site consists on very low permeable soil (mainly clay). There is... Last reply: Michael DeVuono, Oct 24, 2017, 10:12 am |
|
Labelling of waste containersNC-v4 MRp2: Construction and demolition waste management planningposted by Lise Dannesboe on Oct 18, 2017, 5:01 am
Hi. A quick question, which I have not been able to find an answer to in the LEED manual. When labelling our waste containers is it a LEED requirement that it must be in english or is it... Last reply: Kristina Bach, Oct 18, 2017, 8:30 am |
|
Is inputting meters in the Whole Building model a MBCx requirement?NC-v4 EAc1: Enhanced Commissioningposted by Lise Dannesboe on Oct 13, 2017, 4:55 am
Hi. Is it understood correctly that all energy, water and electrical meters (we have a lot more meters than even required by LEED) are not required to be entered into the Whole Building... Last reply: Marcus Sheffer, Oct 15, 2017, 12:17 pm |
|
Use of Whole Building model to predict the energy consumption for each meterNC-v4 EAc3: Advanced Energy Meteringposted by Lise Dannesboe on Oct 11, 2017, 10:49 am
Hi. Hope some can help. In the LEED 2009 version you had to enter the energy consumption for the different measured systems from the Whole building simulation in ordre to see in the... Last reply: Lise Dannesboe, Oct 12, 2017, 1:59 am |
|
Non-smoking signage requirement / location for LEEDv4 CICI-v4 EQp2: Environmental tobacco smoke controlposted by Meike Borchers on Jul 7, 2017, 8:27 am
Hi, we are looking at LEEDv4 CI for a project in London. By UK law it is not permitted to smoke inside office buildings, and the floors of the office building we look to certify are for more than... Last reply: Meike Borchers, Sep 25, 2017, 8:35 am |
|
Visitor parking onlyCI-v4 LTc5: Reduced parking footprintposted by Karen Elliott on Sep 15, 2017, 5:51 am
We have an large office space in Central London that has 2 car parking spaces, but the staff will not be able to use them. They will only be used in exceptional circumstances for visitors. It is... Last reply: Landry Watson, Sep 15, 2017, 5:43 pm |
|
Pilot credit wakable siteCS-v4 INc1: Innovationposted by Tobias Berge on Sep 7, 2017, 4:53 am
We chose to achieve a pilot credit called wakable sites. Unfortunately we discoverad that the credit is closed. We have register the project on LEED online but not registered this specific credit... Last reply: Tristan Roberts, Sep 9, 2017, 3:04 am |