Staff resources for LEED ND Projects

ND-Plan-v4 MPR2: Must use reasonable LEED boundaries
posted by Devani PERERA on Oct 3, 2017, 10:34 am

Hi,

Is it necessary to have a Leed Green Associate or a Leed AP ND to propose one project to the certification LEED ND (plan or built) ?

Thanks for your help.

Regards.

Last reply: Devani PERERA, Oct 6, 2017, 5:06 am

single occupant offices as designated smoking rooms?

CS-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Christian Bösselmann on Sep 5, 2017, 3:32 pm

In a multi tenant CS office building smoking is prohibited in the entire building (Option 1). However the owner wishes to execute a few single person offices as designated smoking rooms. All...

Last reply: Trista Brown, Oct 4, 2017, 8:07 pm

underground infiltration structure LID?

CS-v4 SSc4: Rainwater management
posted by Jens Apel on Sep 15, 2017, 5:20 am

I am not quite sure if the approach discussed in my project team is a viable way to achieve this credit and would like to check back with you. The project is in a dense city location and will be...

Last reply: Jens Apel, Sep 15, 2017, 6:50 am

New versions of AgBB- acceptable for showing compliance?

NC-v4 EQc2: Low-emitting materials
posted by Reinhard Oppl on Feb 2, 2016, 5:33 am

Sara Johansson LEED® AP O+M Skanska Sverige AB LEEDuser Basic Member 2 thumbs up September 12, 2017- 6:20 am Hello Reinhard, have you received any more information on this issue? / Sara Log in or register to post comments Reinhard Oppl Independent consultant on VOC issues formerly with Eurofins Product Testing A/S LEEDuser Basic Member 332 thumbs up September 12, 2017- 3:05 pm Hello Sara, Newer versions of both CDPH and of AgBB are acceptable, as you can see from the comments of Larissa Oaks (US GBC) in this discussion thread: https://leeduser.buildinggreen.com/forum/cdph-v12-2017. Obviously US GBC...

Last reply: Debra a. Lombard, Sep 13, 2017, 3:51 pm

wood that is not waste is eligible?

CS-v4 EAc5: Renewable energy production
posted by Jens Apel on Sep 6, 2017, 5:17 am

I am not quite sure if this is the USGBC's intent, and maybe I'm a nitpicker, but:

-Biofuel "(in some cases)" is eligible, the "some cases" are not further described

-ineligible...

Last reply: Marcus Sheffer, Sep 6, 2017, 12:07 pm

Pilot credit: No Cooling Tower [v4- bc+d)

NC-v4 INc1: Innovation
posted by Ydo Schuuring on Feb 28, 2017, 6:29 am

Hello,

For a project no coolingtowers are used. There for we have the possibility to achieve the Pilot credit No Cooling Tower. The following requirements are given:
Projects may...

Last reply: Emma Hughes, Sep 5, 2017, 4:42 pm

Outdoor Airflow Measurement Device in AHUs

Schools-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Thomas Kohmann on Jul 4, 2017, 6:39 am

There are a few AHUs in the project for which I work.
One...

Last reply: Andrew Mitchell, P.E., Aug 30, 2017, 8:53 pm

Door arrest systems or free-swinging closers allowed?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Florian Schmidtchen on Aug 29, 2017, 6:17 am

Is it allowed to install additional door arrest systems or free-swinging closers to the self-closing doors, so that in case the occupant is able to keep the door open for a short period? This...

Last reply: Tristan Roberts, Aug 30, 2017, 10:48 am

Finished wood

CI-v4 EQc2: Low-emitting materials
posted by Devani PERERA on May 17, 2017, 9:18 am

A finished...

Last reply: Reinhard Oppl, Aug 27, 2017, 8:38 am

LEED for office with few modifications

CI-v4 MPR3: Must comply with project size requirements
posted by Devani PERERA on May 4, 2017, 6:07 am

A project I assess is seeking LEED v4 CI Silver. It is a 5877,1sqft rented office, in an existing building (previously certified Breeam in-use), that is undergoing fit-out (minor improvements =...

Last reply: Tristan Roberts, Aug 26, 2017, 2:03 pm