Topic | Recent |
---|---|
Balancing Devices to meet ASHRAE 90.1 Mandatory RequirementsNC-2009 EAp2: Minimum Energy Performanceposted by Jorge Torres-Coto on Nov 13, 2015, 12:23 pm
We have a project that is an industrial facility, it shares the CHW distribution piping between the comfort system and the process system. We are informing the CxTeam that it is required... Last reply: Marcus Sheffer, Nov 30, 2015, 10:56 am |
|
Main entrance and LEED Project Boundary for Future ExpansionNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Lourdes Salinas on Aug 25, 2015, 7:32 pm
Hi everyone, we are pursuing the LEED Core & Shell certification for a Campus Project. We received the preliminary design review for the projects inside the LEED Campus Boundary. The... Last reply: Tristan Roberts, Nov 27, 2015, 9:30 am |
|
Balancing Devices to meet ASHRAE 90.1 Mandatory RequirementsNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Jorge Torres-Coto on Nov 13, 2015, 12:20 pm
We have a project that is an industrial facility, it shares the CHW distribution piping between the comfort system and the process system. We are informing the CxTeam that it is required... Last reply: Scott Bowman, Nov 19, 2015, 1:52 pm |
|
RoleLEED for Homes (LEED-H) Forumposted by Gustavo De las Heras Izquierdo on Nov 8, 2015, 6:26 pm
Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant? Our experience... Last reply: Asa Foss, Nov 9, 2015, 9:41 am |
|
Case2 Option 1- LabsEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Alicia Villanueva on Sep 7, 2015, 3:13 pm
The project is an innovation center, it has offices (63%), laboratory (28%) and data center (8%), the lab represents more than 10% of the area, we have to use the USGBC Calculator Case 2 Option 1... Last reply: David Eldridge, Sep 8, 2015, 8:29 am |
|
Desktop C02 MonitorsNC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Diego Garcia on Jul 29, 2015, 7:52 pm
Hi, We are currently working on an office building, we want to achieve IEQ cr1, by installing C02 monitors in all spaces. (The building has rooms with mini-plits and windows so we will... Last reply: Andrew Mitchell, P.E., Aug 15, 2015, 12:03 am |
|
Exterior space, partially enclosed- Application of Std.NC-2009 IEQp1: Minimum indoor air quality performanceposted by Mauricio Ramirez on Jul 1, 2015, 9:07 pm
Hello in a Museum, we have an uderground open space, that, on our understanding is an exterior space, as it is outside the Access vestibule. It has a roof overhang but have a completely and... Last reply: Gustavo De las Heras Izquierdo, Jul 6, 2015, 6:20 pm |
|
Shared building electricity meterEBOM-v4 EAp2: Minimum Energy Performanceposted by LEED Pro Consultant on Jan 5, 2015, 2:53 pm
We have a building which shares electricity meter with an adjacent building, only one building will be intended for certification, it is possible to identify the percentage of consumption in... Last reply: LEED Pro Consultant, Jul 2, 2015, 4:39 pm |
|
Reactivating construction with ESC Plan, no ESC Plan beforeNC-2009 SSp1: Construction Activity Pollution Preventionposted by LEED Pro Consultant on Oct 30, 2014, 6:37 pm
Hello! Last reply: Michael E. Edmonds-Bauer, Jun 16, 2015, 6:33 pm |
|
Bamboo and CSCS-2009 MRc6: Certified Woodposted by Rosario Lidia Maguey Peña on May 29, 2015, 2:30 pm
Hi! Is bamboo included in credit MRc6 for Core and Shell? We have a Core and Shell project in which the client wants an specific... Last reply: Charles Nepps, Jun 2, 2015, 9:58 am |