
Forum quick links
How do you calculate the %?
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Russell Davison on
Hi All,
LEED Pilot Credits on Resilient Design
posted by Shalini Gali on
Has anyone had an experience in submitting the following LEED Pilot Credit for resilient design - saw an article online regarding this but cannot get the LEED language on USGBC website yet:
Regd. pressure drop adjustments in baseline fan power calculator
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,
Regd. Primary Secondary Pump Arrangement in PRM Baseline System 8 Modelling
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,
External Signage with internal lighting on construction site.
CS-v4 SSc6:Light pollution reductionposted by Marine Petrosyan on
Hi, All!
I would appreciate it if you could help me with the following question:
Auditorium; lower illuminance level
NC-v4 EQc7:Daylightposted by Jody Lee Potvin-Jones on
Dear LEED forum In LEEDv4 NC it is stated in the reference manual (p735) that "Auditoriums must be included in the daylight requirements, but a lower illuminance level is acceptable; see recommend
Warehouse naturally ventilated
Warehouses-NC-v4 EAp2:Minimum energy performanceposted by Esteban Martinez on
Dear Everyone,
Long-term Bike Distance
NC-v4.1 LTc6:Bicycle Facilitiesposted by Shiva Honarvar on
Hi! I'm working on a project that includes an office tower with several retail spaces on the ground level, each having its own dedicated entrance.
Ordinance says no new minimum parking needed for Parks
NC-v4 LTc7:Reduced parking footprintposted by Akshaya Bhaskar on
We are currently working on a 4000 sq ft park shelter project located in an existing park in Madison, Wisconsin.