Topic | Recent |
---|---|
Material Ingredient Reporting: Most efficient program to use for Site FurnishingsLEED v4.1 Discussion Forumposted by Ryan Demchuk on Jan 9, 2020, 3:39 pm
Hello, we are a site furnishings manufacturer with the intention of ensuring our products can qualify for usage under multiple LEED credits. We are hoping to receive any guidance... |
|
LEEDv4.1 Acoustic- Can residential projects no longer achieve this credit?LEED v4.1 Discussion Forumposted by Sophie Kerr on Jan 8, 2020, 5:11 pm
I noticed LEED v4.1 removes mention of residence and residential. Table 1 removes all 'residence' reference and table 2 removes 'apartment and condominium'. Can residential projects no longer... Last reply: Sophie Kerr, Jan 8, 2020, 5:18 pm |
|
Points for ACP and as Pilot creditPilot-Credits MRpc102: Legal Woodposted by Keith Robertson on Dec 20, 2016, 12:47 pm
We have registered our Canadian project for the Legal... Last reply: Michelle Robinson Schwarting, Dec 19, 2019, 4:18 am |
|
Documentation Required for IP CreditSchools-NC-v4 IPc1: Integrative processposted by Cora Kenrick on Mar 7, 2018, 5:37 pm
Hi Fellow LEED Users, Has anyone submitted this credit yet and what documentation is required. I'm new to LEED and this credit. So hints, tips and advice... Last reply: Emily Purcell, Dec 11, 2019, 9:58 am |
|
Modelling Hospital AdditionHealthcare-v4.1 EAc2: Optimize Energy Performanceposted by Eddie Roach on Nov 20, 2019, 3:10 pm
Hello all, I am currently working to create an energy model for an addition to be made to a hospital and am unsure how to go about modelling the heating system. New air handling... |
|
Structural composite wood and moisture resistant adhesives- compliance and supporting documentationNC-v4.1 EQc2: Low-emitting materialsposted by Esther Ma on Nov 12, 2019, 11:34 am
Hello LEED User community, Does anyone have any information regarding how to show compliance with and document the "moisture resistant adhesives meeting... |
|
LEED BD+C or LEED CS or LEED CI?LEED Rating System Selectionposted by Alara Brinton on Oct 31, 2019, 5:55 pm
Hi All, We have a LEEDv4 new contraction project that will be 50% fit up, 50% empty/core&shell. All same owner, 2nd floor will just be left vacant until the owner decided to develop.... Last reply: Alara Brinton, Nov 1, 2019, 1:49 pm |
|
Option 2- Is there still a minimum sample area requirement?NC-v4 EQc4: Indoor air quality assessmentposted by Daniel Smith on Oct 9, 2018, 4:31 pm
I am quoting to provide Option 2... Last reply: Barbara Beckmann, Oct 31, 2019, 5:47 am |
|
Reduced Parking Footprint Opt 4- Unbundling ParkingNC-v4.1 LTc7: Reduced parking footprintposted by Rebecca Mann on Oct 27, 2019, 10:46 am
New options were introduced in v4.1 for LT Reduced Parking Footprint. Parking provided for our project slightly exceeds the bylaw requirement with 9 stalls required, and 10 provided including 1... |
|
Post-consumer recycled content vs pre-consumer recycled content- LEED V3 excel datasheetNC-v4.1 MRc4: Material Ingredientsposted by Mateus Souki on Oct 17, 2019, 11:31 am
I am working on a project where I must choose the materials for the MRc4 credit - LEED V3 (gold certification). However, as an architect responsible, I don't know if I should accept materials... Last reply: Mateus Souki, Oct 21, 2019, 1:35 pm |