Log in
Forum » Canada
Topic

Points for ACP and as Pilot credit

Pilot-Credits MRpc102: Legal Wood
posted by Keith Robertson on Dec 20, 2016, 12:47 pm

We have registered our Canadian project for the Legal...

Last reply: Michelle Robinson Schwarting, Dec 19, 2019, 4:18 am

Documentation Required for IP Credit

Schools-NC-v4 IPc1: Integrative process
posted by Cora Kenrick on Mar 7, 2018, 5:37 pm

Hi Fellow LEED Users,

Has anyone submitted this credit yet and what documentation is required.

I'm new to LEED and this credit.

So hints, tips and advice...

Last reply: Emily Purcell, Dec 11, 2019, 9:58 am

Modelling Hospital Addition

Healthcare-v4.1 EAc2: Optimize Energy Performance
posted by Eddie Roach on Nov 20, 2019, 3:10 pm

Hello all,

I am currently working to create an energy model for an addition to be made to a hospital and am unsure how to go about modelling the heating system. New air handling...

Structural composite wood and moisture resistant adhesives- compliance and supporting documentation

NC-v4.1 EQc2: Low-emitting materials
posted by Esther Ma on Nov 12, 2019, 11:34 am

Hello LEED User community,

Does anyone have any information regarding how to show compliance with and document the "moisture resistant adhesives meeting...

LEED BD+C or LEED CS or LEED CI?

LEED Rating System Selection
posted by Alara Brinton on Oct 31, 2019, 5:55 pm

Hi All,

We have a LEEDv4 new contraction project that will be 50% fit up, 50% empty/core&shell. All same owner, 2nd floor will just be left vacant until the owner decided to develop....

Last reply: Alara Brinton, Nov 1, 2019, 1:49 pm

Option 2- Is there still a minimum sample area requirement?

NC-v4 EQc4: Indoor air quality assessment
posted by Daniel Smith on Oct 9, 2018, 4:31 pm

I am quoting to provide Option 2...

Last reply: Barbara Beckmann, Oct 31, 2019, 5:47 am

Reduced Parking Footprint Opt 4- Unbundling Parking

NC-v4.1 LTc7: Reduced parking footprint
posted by Rebecca Mann on Oct 27, 2019, 10:46 am

New options were introduced in v4.1 for LT Reduced Parking Footprint. Parking provided for our project slightly exceeds the bylaw requirement with 9 stalls required, and 10 provided including 1...

Post-consumer recycled content vs pre-consumer recycled content- LEED V3 excel datasheet

NC-v4.1 MRc4: Material Ingredients
posted by Mateus Souki on Oct 17, 2019, 11:31 am

I am working on a project where I must choose the materials for the MRc4 credit - LEED V3 (gold certification). However, as an architect responsible, I don't know if I should accept materials...

Last reply: Mateus Souki, Oct 21, 2019, 1:35 pm

Occupant Comfort Survey

NC-v4 INc1: Innovation
posted by Leanne Conrad on Aug 3, 2017, 4:01 pm

Is there a minimum duration after occupancy you must wait to conduct the occupant comfort survey? I want to submit the IN credit with the first construction submittal but don't want to have to...

Last reply: Stephanie Graham, Oct 16, 2019, 3:48 pm

New project on university campus that already has 2700 parking spots

NC-v4 LTc8: Green vehicles
posted by Alana Cristante on Apr 16, 2019, 9:09 am

Hi there,

We are working on a new science lab on a university campus. The campus already has 2700 parking spots, with the current parking demand being only 2100 or so. Our project "...

Last reply: Kim Lombard, Sep 26, 2019, 1:45 pm