Log in
Forum » Latin America and the Caribbean
Topic

TVOC certificate for a glass fiber tank

NC-v4 EQc2: Low-emitting materials
posted by Lourdes Salinas on Mar 29, 2017, 12:15 pm

For a project that has a glass fiber water tank inside the weather barrier in a utility space (not a working space), do we need to get a...

Last reply: Reinhard Oppl, Mar 29, 2017, 6:58 pm

Can roofed areas be considered open space?

CS-2009 SSc5.2: Site development - maximize open space
posted by Alejandro Rivera on Mar 20, 2017, 3:34 am

Our project is a mixed-used building in an urban area that will most probably earn SSc2. As such, we would like to count vegetated roof areas and pedestrian-oriented hardscapes towards credit...

Last reply: Allison Smith, Mar 20, 2017, 12:58 pm

Medical Equipment Specification

Healthcare-v4 WEp2: Indoor water use reduction
posted by Gabriela Crespo on Mar 14, 2017, 1:40 pm

Dear all,

We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req. Would somebody be...

LEED Lab Mexico

Pilot-Credits IPpc96: LEED Lab
posted by David Dominguez on Feb 8, 2017, 4:55 am

We are wrapping up our second semester and finishing our performance period, we expect soon to have the first building in Mexico certified under a LEED-Lab. We are so happy and we would like to...

Requirements for instant water heater with no storage tank

NC-2009 EAp2: Minimum Energy Performance
posted by Gustavo De las Heras Izquierdo on Jan 27, 2017, 10:04 pm

Hallo,

I have read the insulation requirements in Section 7.4.3 but it seems to focus on circulating and non-circulating systems with a storage tank.

Does anyone know insulation...

Last reply: Marcus Sheffer, Jan 29, 2017, 1:53 pm

Hybrid Urinals

CI-2009 WEc1: Water Use Reduction
posted by Nilda De Coutte on Mar 15, 2016, 2:50 pm

Hi, I would like to know if anyone has any information (case study, formal review, experience with) of any of the hybrid urinals currently available in the market. We are interested in installing...

Last reply: Tristan Roberts, Jan 18, 2017, 11:12 am

Leed Footprint exceeds leed Boundary

NC-2009 SSc5.2: Site development - maximize open space
posted by Jorge Lopez de Obeso on Jun 9, 2016, 12:33 pm

Hi, I'm having some problems with a project.
Turns out that local requirements allow me to expand mi building in my superior floors (By this I mean that above my ground floor I can build...

Last reply: Tristan Roberts, Jan 17, 2017, 5:17 pm

We are in the process of

EBOM-v4 WEp1: Indoor water use reduction
posted by LEED Pro Consultant on Jan 13, 2015, 2:23 pm

We are in the process of certifying a Core and Shell building which does not have a previous LEED certification. There is an inquiry regarding tenant engagement and responsibilities, in order to...

Last reply: Tristan Roberts, Jan 17, 2017, 1:15 pm

LEED O&M on a portion of a building

EBOM-v4 MPR3: Must comply with project size requirements
posted by LEED Pro Consultant on Jan 14, 2015, 7:12 pm

Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?

A single entity owns the...

Last reply: Tristan Roberts, Jan 17, 2017, 1:05 pm

10% exemption

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Gustavo De las Heras Izquierdo on May 17, 2016, 6:41 pm

Is it allowed to exclude up to 10% of spaces from this prerequisite?

Our project is a 20-story building that complies with the ventilation rates but there is an office in the core that...

Last reply: Michael Smithing, Jan 16, 2017, 7:27 pm