Log in
Forum » Latin America and the Caribbean
Topic

Showers & Changing Facilities

CS-v4 LTc6: Bicycle facilities
posted by Edna Urias on Jun 15, 2017, 1:57 pm

We were wondering if a Core & Shell building will be subdivided in a future for 2 tenants, do we have to consider shower facilities at 100 feet from each main entrance ? Which in this case...

Last reply: Edna Urias, Jun 16, 2017, 3:24 pm

LEED methodology for calculating water use/efficiency baseline

NC-2009 WEp1: Water Use Reduction
posted by Kwame Emmanuel on May 30, 2017, 2:50 pm

Greetings, I am currently researching the LEED methodology for calculating a water use/efficiency baseline for the housing sector. Any links or advice would be greatly appreciated. Regards.

Last reply: Charles Nepps, Jun 6, 2017, 4:40 pm

MERV filters

EBOM-v4 EQp1: Minimum indoor air quality performance
posted by Gustavo De las Heras Izquierdo on May 4, 2017, 8:19 pm

Is there any mandatory filter efficiency requirement (...

Last reply: Trista Brown, Jun 5, 2017, 8:18 pm

Alternative Compliance Path

CS-2009 EAc1: Optimize Energy Performance
posted by Gabriela Mena on Jun 1, 2017, 2:24 pm

Hi,
We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to...

Last reply: Marcus Sheffer, Jun 1, 2017, 2:35 pm

Alternative Compliance Path

NC-v4 EAc2: Optimize Energy Performance
posted by Gabriela Mena on Jun 1, 2017, 1:58 pm

This only applies to LEED v2009 projects. Please post in the appropriate forum and I will respond. Log in or register to post comments 0 Vote up! ...

Last reply: Marcus Sheffer, Jun 1, 2017, 2:19 pm

EQUIVALENCE WITH VERSION 2009

CI-v4 EQc7: Daylight
posted by Gabriela Mena on May 8, 2017, 4:57 pm

Hi,

We have a CI project that is in a CS Platinum V3 building, the building achieved the IEQ C8.1 for the Core & Shell under Option 1.
I want to know if it is possible to...

Last reply: TODD REED, May 9, 2017, 8:44 am

About disturbance considerations for retention walls.

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Mauricio Ramirez on Mar 3, 2017, 5:24 pm

Hi everyone:

I have a Project that needs to have large retention walls close to the office and main acces road. Therefore, we have staggered concrete retention walls confining the...

Last reply: April Brown, Apr 27, 2017, 1:53 pm

Robotic Parking Garage Ventilation

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Gabriela Mena on Apr 18, 2017, 7:12 pm

Hi,
We have designed a project in Mexico which includes 5 levels for parking garage but it is a robotic parking, we are including a small ventilation fan for each level that provides approx...

Last reply: Michael Smithing, Apr 19, 2017, 10:10 am

Meeting room ID+C: CI certification

CI-v4 MPR3: Must comply with project size requirements
posted by Silvia Ruiz on Apr 6, 2017, 12:39 pm

Hi

A client asked us if they can earn a LEED ID+C: CI certification for a 968 sqft meeting room renewal. The meeting room is inside of an office complex but they want to certificate just...

Last reply: Tristan Roberts, Apr 6, 2017, 1:23 pm

Belated Project Registration / Certification Process Feedback

General forums
posted by Daniela Mendez on Apr 5, 2017, 4:23 pm

Our project is a possible CS, comprised of office, residential and commercial spaces located in Mexico City. The project is not yet registered but is still in construction (since 2012), and we...

Last reply: K Nakamura, Apr 5, 2017, 4:41 pm