Topic | Recent |
---|---|
Environmental Product DeclarationCI-v4 MRc3: Building product disclosure and optimization - environmental product declarationsposted by Gabriela Mena on Jun 13, 2017, 5:06 pm
Hi, We are evaluating the EPD performance of a commercial interior project furniture, the architects are specifiyng Herman Miller Furniture and almost all have the BIFMA certification, I... Last reply: Tristan Roberts, Aug 26, 2017, 2:45 pm |
|
LEED Form MR 4NC-2009 MRc4: Recycled Contentposted by juan pena on Aug 23, 2017, 11:44 am
The assembly... Last reply: Tristan Roberts, Aug 26, 2017, 1:34 pm |
|
belated project registration / certification process feedbackCS-v4 SSp1: Construction Activity Pollution Preventionposted by Daniela Mendez on Apr 18, 2017, 11:41 amTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11478 thumbs up August 26, 2017- 1:19 pm Daniela, this is a tricky situation, particularly as LEED v4 has some credits that reward early design assessments that you won't be able to do. However, as long as you can identify enough credits that you can go after, I don't see any inherent obstacles to the situation. Certainly projects on this forum have done it before, and I hope they will chime in with thoughts. In terms of this prereq, special circumstances like this are not uncommon. I would do your best, document... Last reply: Tristan Roberts, Aug 26, 2017, 1:19 pm |
|
Project size increaseCS-2009 IEQp1: Minimum indoor air quality performanceposted by Silvia Ruiz on Jun 5, 2017, 6:24 pm
Dear all In a project that we are certificating LEED C&S v3 the owner has modified the OPRs, specificly the project size and the MEP system. 1. The project size has increased... Last reply: Tristan Roberts, Aug 26, 2017, 12:08 pm |
|
Thermal Comfort ControlsNC-v4 EQc5: Thermal comfortposted by LEED Pro Consultant on Feb 28, 2017, 1:04 pm
We are working on a project mainly dedicated to showers (83) and changing rooms (20) of a very large complex, with no workspaces within it, Could the project comply with this credit by excluding... Last reply: Tristan Roberts, Aug 26, 2017, 9:08 am |
|
Thermal controls for 50% occupantsCI-v4 EQc5: Thermal comfortposted by Gabriela Mena on Jul 20, 2017, 1:40 pm
Hi, We have a project in Mexico City, the system is VRF and for the interior spaces we have Fan coil units, approximately 60% of the project area is open office space and it is... Last reply: Parker Hall, Aug 8, 2017, 12:40 pm |
|
ERVHomes-v4 EQp1: Ventilationposted by Gustavo De las Heras Izquierdo on Jul 14, 2017, 10:44 am
Has anyone installed an ERV ventilation system? Does it need to be Energy Star certified or this requirement is only for extractors? Last reply: Ian Johnson, Aug 6, 2017, 11:14 am |
|
Option 1 SkylightsCS-v4 EQc4: Daylightposted by Edna Urias on Aug 5, 2017, 3:28 pm
We are installing polycarbonate skylights on an industrial plant Core & Shell project. In order to comply with Option 1, i noticed it requires blinds as glazing elements to be installed,... |
|
Baseline system selectionNC-v4 EAp2: Minimum Energy Performanceposted by Gaston Michaud on Jul 26, 2017, 7:38 pm
Hello everyone, Last reply: Marcus Sheffer, Jul 28, 2017, 12:13 pm |
|
Product type classificationNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Raquel Ortiz on Jan 23, 2017, 5:23 pm
Hello, Last reply: Susan Walter, Jul 25, 2017, 4:06 pm |