Log in
Forum » Credit Forums
Topic

LEED ACP for District Energy (PEER) for ID+C?

CI-v4 EAp2: Minimum Energy Performance
posted by Brian Salazar on Oct 10, 2023, 1:43 pm

Hello!  We are working on a stand-alone building interior, ...

Last reply: Tyler Thumma, Oct 25, 2023, 8:28 am

Integrative Analysis of Building Materials-- International Projects

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Marina Rullo on Oct 24, 2023, 12:39 pm

We have attempted this pilot credit as a US-based company for a project that is in the UK. Does anyone have experience with doing the Integrative Analysis Matrix for non-US products? We found it...

Last reply: Azra Semic, Oct 25, 2023, 12:53 am

Integrative Analysis of Building Materials- Work Smarter, Not Harder

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Marina Rullo on Oct 23, 2023, 12:16 pm

This pilot credit is a useful way to both qualitatively and quantitatively examine the human health implications, environmental impacts, and safety impacts of building materials.

We’ve...

single or multi-zone?

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Guilherme Ramos on Mar 7, 2013, 11:27 am

Our building is fully occupied by the same company, so all the floors have similar open space layout, except for enclosed managers or small meeting rooms.

There´s an outside air intake in...

Last reply: Dave Hubka, Oct 24, 2023, 10:55 am

Thermal Comfort Control for Individual Spaces

CI-v4.1 EQc5: Thermal comfort
posted by Yamona Segar on Oct 23, 2023, 11:01 pm

In our open office space, we utilize a centralized AC system controlled by the landlord, and they allow for setpoint adjustments upon staff request for thermal comfort control. However, USGBC did...

Strategy 7. Operable Windows- ASHRAE 62.1-2016 for windows location

NC-v4.1 EQc1: Enhanced indoor air quality strategies
posted by MAUDE PINTAL on Mar 24, 2022, 3:31 pm

Hello

As part of a residential project aimed at LEEDv4 BD+C certification, we are studying the different possibilities to meet the "Enhanced Indoor Air Quality Strategies" credit with the...

Last reply: Dave Hubka, Oct 24, 2023, 9:21 am

Light Pollution Prevention during construction (internally illuminated signage)

CS-v4 SSc6: Light Pollution Reduction
posted by Marine Petrosyan on Oct 23, 2023, 2:05 am

Hi All!

The project owner wants to place internally illuminated signage on the wing of the top of the lifting crane during the construction. I understand this should be regulated under "...

Last reply: Marine Petrosyan, Oct 23, 2023, 10:11 am

MERV Filters for PM 2.5

NC-v4 EQp1: Minimum indoor air quality performance
posted by Banu Banu on Oct 21, 2023, 8:41 am

Dear All, 

In our project we have Direct Evaporative coolers . It is a garment production building. In Evaporative coolers, usually the process is mixing of Air & water. 

So, if...

lighting zone type for project is located in new development area

CS-v4 SSc6: Light Pollution Reduction
posted by Linh Dang on Oct 12, 2023, 5:52 am

Dear all, 

i am consulting for a project is located in the new development area next to the developed area which has high rise buildings and residential buildings. There are not many...

Last reply: Bill Swanson, Oct 23, 2023, 9:42 am

U value compliance for Revolving Doors

NC-v4 EAp2: Minimum Energy Performance
posted by Alokmay Behera on Oct 23, 2023, 4:37 am

I am working on a LEED project with revolving doors. The targetted U value for glaze is 1.9 W/Sqft.K (including frames),...

Last reply: Alokmay Behera, Oct 23, 2023, 5:13 am