Schedule for Data Center LoadNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Aug 7, 2023, 3:14 pm
Hi I am modeling a Data Center what schedule should I use for IT loads, should I run it for 100% all the time? Last reply: Marcus Sheffer, Aug 9, 2023, 4:37 pm |
|
Anyone been through full review of this credit yet?Pilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Joanna Switzer on Oct 26, 2017, 2:57 pmthis credit. Log in or register to post comments Summer Minchew Managing Partner Ecoimpact Consulting LEEDuser Expert 157 thumbs up August 6, 2020- 10:28 am Based on forum comments (and my own previously... Last reply: Mariia Savinska, Aug 4, 2023, 4:04 am |
|
Does LEED Project hours count towards LEED Specific CE Hours and Regular CE HoursLEED Recertification: When and Howposted by Richard Metts on Jun 10, 2019, 11:30 am
Hello everyone, I am working on a LEED project and I am the person responsible for gathering and uploading the LEED data into the USGBC data base. My CE reporting date is coming up soon. I have... Last reply: Rasha Younan, Aug 3, 2023, 11:20 am |
|
Indoor Water Use Calculator malfunctionNC-v4 WEp2: Indoor water use reductionposted by Susan Di Giulio on Jan 25, 2022, 3:03 pm2023- 6:03 pm So I just ran into this same issue, and it too was super annoying and frustrating. After reviewing this forum and unfrotuantely not having any luck after chaning the macro settings... Last reply: Gwenedd Murray, Jul 28, 2023, 6:03 pm |
|
Have any projects outside of Washington DC pursued this credit?Pilot-Credits SSpc130: Offsite Rainwater Managementposted by elena sviatoslavsky on Jul 26, 2023, 4:30 pm
I'm wondering if any project outside of Washington DC pursued this pilot credit. If so, please describe the process and which SRC market was used to purchase SRCs. I know the pilot credit is... |
|
ASHRAE 55-2010 documentationNC-v4 EQc5: Thermal comfortposted by Katie Vasbinder on Jan 19, 2021, 11:29 am
The Upload for this credit indicates "Documentation may include a psychometric chart, PMV/PPD calculations... Figure 5.2.4.1 and/or Figure 5.2.4.4, or predicted worst case...". Given the amount... Last reply: Aleksandra Suchomska, Jul 26, 2023, 10:48 am |
|
Band for UMLHs for vault spaces in a Data CenterNC-v4 EAc2: Optimize Energy Performanceposted by Rajat Wadhwa on Jul 5, 2023, 3:06 pm
Hi , I am modeling a LEED model for data center, now for vault spaces I am assuming a setpoint of 99 F for cooling and 20 F for heating, what should be band to consider a vault space UMLH? for... Last reply: Rajat Wadhwa, Jul 21, 2023, 1:27 pm |
|
Irrigation Establishment Period Flexibility / Regional AdjustmentsNC-v4 WEp1: Outdoor water use reductionposted by Pooja Sannamani on Mar 8, 2022, 5:16 pm
For the WE pre-requisite and credit Outdoor Water Use Reduction, specifically Option 1 (No Irrigation Required), can the irrigation system installed go beyond the maximum two-... Last reply: emily reese moody, Jul 20, 2023, 11:09 pm |
|
Option 2, ANC-v4 EQc6: Interior lightingposted by Simon Lai on May 9, 2016, 11:47 am
In the open office, I'm providing direct/indirect fluorescent up-light, does it meet the exception of the Option 2A? Last reply: Glenn Heinmiller, Jul 20, 2023, 5:18 pm |
|
Waste ManangementWarehouses-NC-v4.1 MRc5: Construction and demolition waste managementposted by Joseph Snider on Jul 20, 2023, 10:54 am