Log in
Forum » Vietnam
Topic

Location of OA monitor at PAU or AHUs

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Indochine Engineering VN on Oct 8, 2015, 4:04 am

Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every...

Last reply: Andrew Mitchell, P.E., Oct 13, 2015, 1:55 pm

Biomass for process steam

NC-2009 EAp2: Minimum Energy Performance
posted by Melissa Merryweather on Oct 1, 2015, 2:08 am

I am working on a factory that uses process steam, which accounts for about half of the whole energy use. All the process steam is generated by a biomass steam boiler; the fuel being agricultural...

Last reply: Christopher Schaffner, Oct 3, 2015, 11:42 am

62MZ calc for critical zones

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Indochine Engineering VN on Aug 27, 2015, 12:01 am

Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there. I plan...

To what extent we provide Tenant fitout

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Indochine Engineering VN on Aug 7, 2015, 3:27 am

Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office. I was of the understanding that daylight and view credit require...

Last reply: Eddy Santosa, Aug 7, 2015, 10:10 am

OA calculation

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Indochine Engineering VN on Jun 16, 2015, 6:28 am

Hi, I just received the feedback from reviewer. We have...

Last reply: Gustavo De las Heras Izquierdo, Jul 17, 2015, 2:08 pm

Lighting control in Tenant space

CS-2009 EAp2: Minimum Energy Performance
posted by Indochine Engineering VN on Jun 16, 2015, 1:03 am

Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE. Item 9.4.1.1 says automatic control...

Last reply: Marcus Sheffer, Jun 16, 2015, 9:45 am

Equipment Capacities for only one building pursue LEED

NC-2009 EAp2: Minimum Energy Performance
posted by Indochine Engineering VN on Apr 24, 2015, 5:36 am

Hi, I have a District energy system (chillers, boilers, cooling towers, pumps) serves 3 buildings but only 1 pursues LEED, so my project doesn't use total capacities of those equipments. My...

Last reply: Lawrence Lile, May 7, 2015, 12:15 pm

Ancillary site buildings

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Erin Holdenried on Feb 18, 2015, 5:32 pm

Are unoccupied ancillary site buildings included in the credit? Or SSc7.2?

Thanks for your feedback!

Last reply: Devani PERERA, Mar 12, 2015, 11:49 am

loading bay inside building footprint

NC-2009 PIf2: Project Summary Details
posted by Melissa Merryweather on Nov 13, 2014, 1:04 am

Hi, I have a garment factory and the loading...

link goes to the main USGBC home page

Pilot-Credits PC14: Walkable Streets
posted by Melissa Merryweather on Oct 28, 2014, 11:00 pm

Hi, I am registered for this Pilot Credit. However, when I went to register my user-name for this credit using your link at the top of this page (step 2) I get a message saying I don't have...