Topic | Recent |
---|---|
Robotic Parking Garage VentilationNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Gabriela Mena on Apr 18, 2017, 7:12 pm
Hi, Last reply: Michael Smithing, Apr 19, 2017, 10:10 am |
|
Belated Project Registration / Certification Process FeedbackGeneral forumsposted by Daniela Mendez on Apr 5, 2017, 4:23 pm
Our project is a possible CS, comprised of office, residential and commercial spaces located in Mexico City. The project is not yet registered but is still in construction (since 2012), and we... Last reply: K Nakamura, Apr 5, 2017, 4:41 pm |
|
TVOC certificate for a glass fiber tankNC-v4 EQc2: Low-emitting materialsposted by Lourdes Salinas on Mar 29, 2017, 12:15 pm
For a project that has a glass fiber water tank inside the weather barrier in a utility space (not a working space), do we need to get a... Last reply: Reinhard Oppl, Mar 29, 2017, 6:58 pm |
|
Medical Equipment SpecificationHealthcare-v4 WEp2: Indoor water use reductionposted by Gabriela Crespo on Mar 14, 2017, 1:40 pm
Dear all, We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req. Would somebody be... |
|
LEED Lab MexicoPilot-Credits IPpc96: LEED Labposted by David Dominguez on Feb 8, 2017, 4:55 am
We are wrapping up our second semester and finishing our performance period, we expect soon to have the first building in Mexico certified under a LEED-Lab. We are so happy and we would like to... |
|
Requirements for instant water heater with no storage tankNC-2009 EAp2: Minimum Energy Performanceposted by Gustavo De las Heras Izquierdo on Jan 27, 2017, 10:04 pm
Hallo, I have read the insulation requirements in Section 7.4.3 but it seems to focus on circulating and non-circulating systems with a storage tank. Does anyone know insulation... Last reply: Marcus Sheffer, Jan 29, 2017, 1:53 pm |
|
Leed Footprint exceeds leed BoundaryNC-2009 SSc5.2: Site development - maximize open spaceposted by Jorge Lopez de Obeso on Jun 9, 2016, 12:33 pm
Hi, I'm having some problems with a project. Last reply: Tristan Roberts, Jan 17, 2017, 5:17 pm |
|
We are in the process ofEBOM-v4 WEp1: Indoor water use reductionposted by LEED Pro Consultant on Jan 13, 2015, 2:23 pm
We are in the process of certifying a Core and Shell building which does not have a previous LEED certification. There is an inquiry regarding tenant engagement and responsibilities, in order to... Last reply: Tristan Roberts, Jan 17, 2017, 1:15 pm |
|
LEED O&M on a portion of a buildingEBOM-v4 MPR3: Must comply with project size requirementsposted by LEED Pro Consultant on Jan 14, 2015, 7:12 pm
Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification? A single entity owns the... Last reply: Tristan Roberts, Jan 17, 2017, 1:05 pm |
|
10% exemptionEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on May 17, 2016, 6:41 pm
Is it allowed to exclude up to 10% of spaces from this prerequisite? Our project is a 20-story building that complies with the ventilation rates but there is an office in the core that... Last reply: Michael Smithing, Jan 16, 2017, 7:27 pm |