Topic | Recent |
---|---|
Case 2 Demand Response Capable Building with a "future" programNC-v4.1 EAc4: Grid Harmonizationposted by Chris Flint Chatto on May 27, 2021, 8:11 pm
Is case 2 only available to projects with utilities that don't have... Last reply: AJ Ahmed, May 22, 2024, 7:21 am |
|
Arbitrage optionCS-v4 EAc5: Renewable energy productionposted by Glen Boldt on May 17, 2024, 7:09 pm
When using the "arbitrage" option, is there a limit regarding where, geographically, the replacement RECs can be purchased form? Within the USA, do they need to be purchsed from a renewable... Last reply: Marcus Sheffer, May 17, 2024, 7:35 pm |
|
LEED v5 for existing building cleaning standardsLEED v5 O&M Existing Buildings Public Commentsposted by Jim Wallace on May 15, 2024, 3:05 pm
My name is Jim Wallace, and I am a COO for the professional cleaning industry based in Detroit. I am concerned that the proposed LEED v5 undervalues cleaning, particularly green cleaning... |
|
Green CleaningLEED v5 O&M Existing Buildings Public Commentsposted by Dana Perry on May 15, 2024, 3:18 pm
My name Dana Perry and my comments represent New Image Building Services, a facility service provider regarding the Proposed LEED O+M: Existing Buildings v5 draft. Specifically, our comments... |
|
BABA (Build America Buy America) + LEEDLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Linnea Morgan on May 15, 2024, 10:46 am
How will federal funded buildings required to meet domestic content BABA requirements overlap with LEED? Has USGBC considered new compliance pathways for these projects meeting both BABA... |
|
What if Question- Bathroom removed from scope, how to comply with WEp1?CI-v4 WEp1: Indoor water use reductionposted by Edgar Arevalo on Mar 21, 2024, 2:57 pm
How would a project comply with WEp1 if the bathroom was removed from scope. This is a interior fit out of part of a floor, and the common restrooms shared by the project space and the rest of... Last reply: emily reese moody, May 11, 2024, 5:18 pm |
|
Laboratory SinksCI-v4 WEc1: Indoor water use reductionposted by Edgar Arevalo on May 9, 2024, 1:44 pm
I have a laboratory project where they will include sinks in the bio lab spaces. How do we include this in the indoor water use calculator, would it be more like a kitchen faucet or public... Last reply: Edgar Arevalo, May 11, 2024, 8:53 am |
|
LEED O+M v4 Warehouses and Distribution CentersLEED Rating System Selectionposted by Ralph Bicknese on Jan 24, 2024, 1:16 pm
We are evaluating utilizing LEED O+M for Warehouses and Distribution Centers for a 1.5M sf Distribution Center where the all parties are very interested in being able to achieve a LEED rating and... Last reply: Andrey Kuznetsov, May 9, 2024, 6:10 pm |
|
Certifiying a Historic Building & New ConstructionLEED Rating System Selectionposted by Dominique Dowd on Feb 8, 2024, 5:22 pm
I'm working a v4 BD+C Multifamily project.... Last reply: Susan Di Giulio, May 9, 2024, 1:50 pm |
|
Need More attention to CleaningLEED v5 O&M Existing Buildings Public Commentsposted by Brian Rauch on May 6, 2024, 2:06 pm
The draft version of LEED v5 for existing buildings (1)undervalues cleaning in the weighting process, (2)eliminates the prerequisite for systems and worker training, and (3) does not provide a... |