Log in
Forum » Vietnam
Topic

Rating system: NC, CI or EBOM?

LEED Rating System Selection
posted by Melissa Merryweather on Jul 28, 2015, 2:06 am

I seem to be posting on this thread constantly! I wish I had a straight-forward LEED project. My current concern is a single university building. They will renovate about 90% of the interior in 2...

Last reply: OSCAR DE LA RED, Dec 21, 2015, 5:32 am

Doing monthly photo report of IAQ management

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Indochine Engineering VN on Dec 13, 2015, 11:35 pm

Hi,

My project is under construction, but just structural work (finalizing substructure and launching superstructure). It is long way to furnishing and MEP work onsite. I have read several...

Last reply: Susan Walter, Dec 14, 2015, 6:25 pm

ASHRAE 55- apartment

NC-2009 IEQc7.1: Thermal comfort - design
posted by Indochine Engineering VN on Aug 30, 2015, 11:08 am

My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally. I'm wondering how to document for this credit: do I...

Last reply: Christopher Schaffner, Dec 11, 2015, 4:50 pm

Probability distribution of annual PV production.

NC-2009 EAc2: On-Site Renewable Energy
posted by Indochine Engineering VN on Nov 16, 2015, 9:25 pm

Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production. The peak is 79 MWh/year with Probability of 50 - P50 (we...

Last reply: Marcus Sheffer, Nov 17, 2015, 9:23 am

FSC Mix cabinet with Recycled content

NC-2009 MRc7: Certified Wood
posted by Indochine Engineering VN on Oct 28, 2015, 4:19 am

Hi, one kitchen supplier showed me their...

Last reply: Lori Knosalla, Oct 29, 2015, 4:27 pm

Location of OA monitor at PAU or AHUs

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Indochine Engineering VN on Oct 8, 2015, 4:04 am

Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every...

Last reply: Andrew Mitchell, P.E., Oct 13, 2015, 1:55 pm

Biomass for process steam

NC-2009 EAp2: Minimum Energy Performance
posted by Melissa Merryweather on Oct 1, 2015, 2:08 am

I am working on a factory that uses process steam, which accounts for about half of the whole energy use. All the process steam is generated by a biomass steam boiler; the fuel being agricultural...

Last reply: Christopher Schaffner, Oct 3, 2015, 11:42 am

62MZ calc for critical zones

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Indochine Engineering VN on Aug 27, 2015, 12:01 am

Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there. I plan...

To what extent we provide Tenant fitout

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Indochine Engineering VN on Aug 7, 2015, 3:27 am

Hi, my project has 19 office floors, and one floor is already fitted out by tenant. So the rest 18 floors are empty - open office. I was of the understanding that daylight and view credit require...

Last reply: Eddy Santosa, Aug 7, 2015, 10:10 am

OA calculation

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Indochine Engineering VN on Jun 16, 2015, 6:28 am

Hi, I just received the feedback from reviewer. We have...

Last reply: Gustavo De las Heras Izquierdo, Jul 17, 2015, 2:08 pm