All water reduction through recyclingNC-2009 WEc3: Water Use Reductionposted by Melissa Merryweather on Mar 23, 2016, 7:04 am
I'm just curious if anyone has experience not even achieving the basic 20% reduction with the sanitary ware, but then achieving innovation points on both WEc2 and WEc3 (and of course the regional... |
|
Solar EnergyNC-2009 EAc2: On-Site Renewable Energyposted by SAMY Chamy on Mar 16, 2016, 1:35 am
Dear Al:- Our project have 50 kWp Grid connected solar panel system with out battery back up. the project is individual and the solar panel is only for this factory alone the... Last reply: Marcus Sheffer, Mar 22, 2016, 11:15 am |
|
Is it too late to do SSp1?NC-2009 SSp1: Construction Activity Pollution Preventionposted by Indochine Engineering VN on Mar 15, 2016, 4:52 am
Hi, My project is a hotel and client just decided to do LEED when Construction of... |
|
Recycled content in Steel frame of facadeNC-2009 MRc4: Recycled Contentposted by Indochine Engineering VN on Jan 6, 2016, 1:54 am
Hi, I would like to ask in case that facade manufacturer cannot confirm... Last reply: RETIRED, Jan 11, 2016, 1:18 pm |
|
Major Renovation Building Energy ModellingNC-2009 EAp2: Minimum Energy Performanceposted by SAMY Chamy on Dec 21, 2015, 2:05 am
Dear All We are currently working on a Major Renovation Building. we are confused a lot in selecting a base case for Energy Modelling 1.Is there any specific modelling guidelines... Last reply: Marcus Sheffer, Dec 22, 2015, 10:19 am |
|
Rating system: NC, CI or EBOM?LEED Rating System Selectionposted by Melissa Merryweather on Jul 28, 2015, 2:06 am
I seem to be posting on this thread constantly! I wish I had a straight-forward LEED project. My current concern is a single university building. They will renovate about 90% of the interior in 2... Last reply: OSCAR DE LA RED, Dec 21, 2015, 5:32 am |
|
Doing monthly photo report of IAQ managementNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Indochine Engineering VN on Dec 13, 2015, 11:35 pm
Hi, My project is under construction, but just structural work (finalizing substructure and launching superstructure). It is long way to furnishing and MEP work onsite. I have read several... Last reply: Susan Walter, Dec 14, 2015, 6:25 pm |
|
ASHRAE 55- apartmentNC-2009 IEQc7.1: Thermal comfort - designposted by Indochine Engineering VN on Aug 30, 2015, 11:08 am
My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally. I'm wondering how to document for this credit: do I... Last reply: Christopher Schaffner, Dec 11, 2015, 4:50 pm |
|
Probability distribution of annual PV production.NC-2009 EAc2: On-Site Renewable Energyposted by Indochine Engineering VN on Nov 16, 2015, 9:25 pm
Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production. The peak is 79 MWh/year with Probability of 50 - P50 (we... Last reply: Marcus Sheffer, Nov 17, 2015, 9:23 am |
|
FSC Mix cabinet with Recycled contentNC-2009 MRc7: Certified Woodposted by Indochine Engineering VN on Oct 28, 2015, 4:19 am
Hi, one kitchen supplier showed me their... Last reply: Lori Knosalla, Oct 29, 2015, 4:27 pm |