Choosing between LEED CS and EB for commercial building in India

LEED Rating System Selection
posted by Pushkala R on Dec 5, 2014, 2:33 am

HI,
I am trying to apply for LEED certification as per LEED v3 2009 in India. My project profile is as follows:
1. It an existing building that has been in use for over a decade...

Last reply: Tristan Roberts, Nov 27, 2015, 3:39 pm

treat wastewater to teriary standards?

NC-2009 WEc3: Water Use Reduction
posted by Erin Holdenried on Sep 2, 2015, 5:55 pm

I have a project that is pursuing WEc2 via Option 2 treating wastewater to tertiary standards and infiltrating onsite through landscape irrigation. Can this factor into water saving for WEc3??...

Last reply: Tristan Roberts, Nov 27, 2015, 2:33 pm

District Co generation Plantby

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by satheesh M on Nov 8, 2015, 1:07 am

Hi,
The building is catered by own chiller plant located in the building & building owned...

Last reply: Michael Opitz, Nov 10, 2015, 6:50 pm

LEED Boundary

NC-2009 IEQp1: Minimum indoor air quality performance
posted by ABDUL MUTHALIB MOHAMED on Nov 5, 2015, 11:19 pm

Andrew Mitchell, P.E. Principal Mitchell Gulledge Engineering, Inc. LEEDuser Expert 126 thumbs up November 6, 2015- 8:22 am You should ask this on the SSc7.2 forum. Tristan may be able to relocate it for you. Log in or register to post comments ...

Last reply: Andrew Mitchell, P.E., Nov 6, 2015, 8:22 am

Airconditioning for process requirement

NC-2009 EAp2: Minimum Energy Performance
posted by Rathnashree Bharadwaj on Oct 30, 2015, 2:13 am

Hi,

We are working on a tablet manufacturing facility which is fully air conditioned (Only cooling, no heating requirement). More than 50% of the areas have RH less than 40% and...

Last reply: Marcus Sheffer, Nov 3, 2015, 9:21 am

prescriptive efficiency requirements ABCPG section 2.9

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Rahul Yadav on Oct 26, 2015, 7:23 am

Hi We are doing a LEED CI project in India. The scope of the project includes only...

Last reply: Marcus Sheffer, Nov 2, 2015, 9:17 am

Mandatory requirements

NC-2009 EAp2: Minimum Energy Performance
posted by Rathnashree Bharadwaj on Sep 25, 2015, 1:08 am

Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance. In continuation with that discussion, i request for a couple of...

Last reply: Marcus Sheffer, Sep 25, 2015, 10:56 am

CO2 SENSOR IN AN UNDERGROUND METRO STATION.

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by VEL MUTHU on Sep 12, 2015, 2:11 pm

Hello everyone,

I am working in a underground metro station which is aiming for LEED certification. I am facing difficulties with placing...

Last reply: Andrew Mitchell, P.E., Sep 15, 2015, 10:37 am

HVAC duct insulation adhesive

NC-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Gaura Saxena on Aug 27, 2015, 12:11 am

Hi
For a project using an adhesive for HVAC duct insulation, what should be the...

Last reply: Jon Clifford, Aug 31, 2015, 8:17 pm

Pick up and Drop Facility

CI-2009 SSc3.1: Alternative transportation - public transportation access
posted by Priyadarsi Das on Jul 6, 2015, 8:52 am

We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating. We have provided Pick up and drop facility for the occupants of our...