Topic | Recent |
---|---|
Outdoor ventilation rates in baseline and proposedCS-v4 EAp2: Minimum Energy Performanceposted by Sarah Leenknegt on Apr 7, 2020, 5:45 am
Hi Our situation is the following: the outdoor ventilation rates in the proposed building are higher than required by ASHRAE 62.1. Therefore, the baseline model will have lower outdoor... Last reply: Tyler Thumma, Apr 15, 2020, 1:13 pm |
|
Conservation Organization compliance for Option 2CS-v4 SSc2: Site development - protect or restore habitatposted by Kévin THIZY on Feb 2, 2017, 9:39 am
Hi, In order to satisfy Option 2 - Financial support - requirements for our project (location : near Paris, France), we selected a conservation organization regionally and nationally... Last reply: Kévin THIZY, Apr 14, 2020, 1:38 pm |
|
Alternative Compliance PathsWarehouses-NC-v4 EQp1: Minimum indoor air quality performanceposted by Sam Tognet on Mar 25, 2020, 6:22 am
Hello, I am working on a freight hub construction project in France. The project is composed of a 20,000 cubic meter warehouse which is naturally ventilated. Last reply: Alessandro Zuanon, Apr 10, 2020, 4:46 am |
|
Interior Paints and CoatingsNC-v4 EQc2: Low-emitting materialsposted by Reinhard Oppl on Dec 16, 2015, 8:51 am
Who can help to clarify? I am in a discussion with consultants who state that for paints and coatings, wet-applied on-site on walls, floors and ceilings, the... Last reply: Oliver Bate, Mar 30, 2020, 6:07 am |
|
Automatic Receptacle ControlNC-v4 EAp2: Minimum Energy Performanceposted by Jan Hesse on Aug 7, 2015, 6:36 am
ASHRAE 90.1-2010 8.4.2 states, that 50% of all 125 volt 15- and 20-Ampere receptacle outlets in private offcies, open offices and computer classrooms shall be automatically switched off when the... Last reply: Marcus Sheffer, Mar 25, 2020, 11:58 am |
|
Freight hubLEED Rating System Selectionposted by Sam Tognet on Mar 25, 2020, 6:16 am
Hello, The project consists in a freight hub located in France. It is composed of a 2000 square meter warehouse, a side of which being dedicated to a part composed of a dozen office rooms... |
|
Reduced parking FootprintNC-v4.1 LTc7: Reduced parking footprintposted by Maria sAra Di maggio on May 7, 2019, 6:32 am
Hi! Are on-street car parking spots belonging to the project owner counted towards the final car parking capacity in LEED Version V4.1? Last reply: Rodolfo Loro, Jr., Mar 18, 2020, 8:24 am |
|
Satisfaction of the authorityNC-v4 LTc3: High priority siteposted by Florian Schmidtchen on Jun 2, 2017, 8:21 am
Dear all, Last reply: Luis Huertas, Mar 12, 2020, 12:28 pm |
|
Bike parking in the basementCS-v4 LTc6: Bicycle facilitiesposted by Guillaume Rose on Feb 28, 2020, 5:15 am
Hello, Could you tell me if it is possible to have bicycle parking in the 2nd basement with an elevator dedicated to bikes? Last reply: Marilyn Specht, Mar 10, 2020, 11:30 am |
|
Rain water infiltrationNC-v4 SSc4: Rainwater managementposted by Marion THIBAULT on Feb 25, 2020, 7:35 am
Hello Does the Rainwater Management credit and the OPTION 1. PERCENTILE OF RAINFALL EVENTS (Path 2. 98th Percentile) option require water... Last reply: Gustavo De las Heras Izquierdo, Feb 26, 2020, 1:37 pm |