Log in
Forum » United States
Topic

Reviewer requires cutsheets

NC-v4 EQc6: Interior lighting
posted by Edgar Arevalo on Oct 13, 2023, 1:58 pm

Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit.  I need to ask,...

Last reply: Umesh Atre, Oct 13, 2023, 5:21 pm

Reviewer requires cutsheets

CI-v4 EQc6: Interior lighting
posted by Edgar Arevalo on Oct 13, 2023, 1:56 pm

Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit.  I need to ask,...

Glare Control for Regularly Occupied Spaces

NC-v4.1 EQc6: Interior lighting
posted by Lauren Kottis on Feb 7, 2022, 9:58 am

"For all regularly occupied spaces, meet one of the following requirements:  

  1. Use light fixtures with a luminance of less than 7,000 candela per square meter (cd/m)2 between...

Last reply: Sara BENLOUBA, Oct 13, 2023, 11:14 am

Prescriptive Compliance- Documentation?

CI-v4.1 EAp2: Minimum Energy Performance
posted by Edgar Arevalo on Oct 3, 2023, 3:00 pm

So how should one pursue the prescriptive method for this prerequisite?  In the sample form, it says to provide documentation demonstrating compliance with ASHRAE 90.1-2016, Sections 5 though 9...

Last reply: Marcus Sheffer, Oct 10, 2023, 10:36 am

LPD for IT Rooms and IT Closet

CI-v4 EAp2: Minimum Energy Performance
posted by Edgar Arevalo on Oct 5, 2023, 3:36 pm

So according to 2010 ASHRAE 90.1, there is no...

Last reply: Marcus Sheffer, Oct 8, 2023, 11:03 am

Pilot Credit MRpc131: Circular Products

NC-v4 INc1: Innovation
posted by Amber Morris on Jan 6, 2021, 11:39 am

Hello all,

Our project team is currently pursuing this credit and was able to achieve it through door hardware manufacturers such as Sargent, McKinney, Norton, Pemko and CECO since they...

Last reply: Sara O'Mara, Oct 4, 2023, 5:00 pm

Can ground level landscape be classified as Nonroof Measures?

NC-v4.1 SSc5: Heat Island Reduction
posted by Antonio Poblete on Jul 18, 2023, 3:04 pm

Do areas with ground level landscape count towards any of the calculations? 

Also, I have area that is just ground, no landscape or hardscape is that excluded from the calculations?

Last reply: emily reese moody, Oct 3, 2023, 8:41 pm

Can someone with old LEED AP credentials

CI-v4 INc2: LEED Accredited Professional
posted by Edgar Arevalo on Sep 6, 2023, 10:12 am

3, 2023- 2:54 pm Hello Dave.  Thanks again for providing that information.  However, when I checked the forum for the LEED v4.1 version of this credit, people were still saying someone only with a LEED...

Last reply: Dave Hubka, Oct 3, 2023, 3:42 pm

AEDG for Libraries

CI-v4 EAp2: Minimum Energy Performance
posted by Edgar Arevalo on Aug 14, 2023, 10:45 am

I have a CI project for a Library.  The team is looking to pursue prescriptive compliance for this credit.  The issue is when attempting to complete the AEDG table, I don't know which category...

Last reply: Marcus Sheffer, Sep 29, 2023, 3:19 pm

Calculating Baseline Fan Power and CFM?

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Sep 15, 2023, 4:57 pm

How should I calculate the Fan CFm and power for Baseline LEED Model, Autosize the baseline system , then use Q=mCpDeltaT to calculate fan CFM and then find out the HP and use pressur adjustment...

Last reply: Tyler Thumma, Sep 29, 2023, 10:08 am