Topic

Option 2- Strategy F: work surfaces comply but no movable partitions in the project

NC-v4 EQc6: Interior lighting
posted by Benjamin Weise on Feb 19, 2020, 2:39 am

We are planning to comply with the strategies A, B, C and F. The strategies A, B and C should not pose a problem. However, I am not sure about strategy F:

Work surfaces will be grey-white...

Last reply: Kera Lagios, Jun 22, 2020, 9:32 pm

Is tehre a reference as to which costs are to be considered?

NC-v4.1 MRc3: Sourcing of Raw Materials
posted by Benjamin Weise on Mar 23, 2020, 3:39 am

Hi,

this question is about a project in Germany, so cost estimates might work differently here. We are having difficulties retrieving the material costs from the subcontractors.

The...

Last reply: Shawn Keith, Jun 4, 2020, 3:27 pm

Future renewable energy within the leed border

CS-v4 EAc5: Renewable energy production
posted by Instra Ingenieros on Sep 30, 2019, 11:31 am

Hi!

We have a project that the owner want to deliver the LEED documentation at the end of 2019. The project will have an a huge quantity of photovoltaic energy in the roofs of the...

Last reply: Instra Ingenieros, Jun 3, 2020, 9:27 am

Energy Data of buildins in Saoudi Arabia

NC-v4.1 EAp3: Building-level energy metering
posted by Guillaume Rose on May 5, 2020, 9:45 am

Hi everyone, 

I would like to know if anyone knows of a site that provides measured consumption data for leed certified buildings in Saudi Arabia?

Thank you for your help,

...

Last reply: Marcus Sheffer, May 18, 2020, 10:41 am

Sound transmission- STC Rating- Specify

NC-v4 EQc9: Acoustic performance
posted by Stephan Zweig on Feb 14, 2019, 5:38 am

Hello Leed User community,

I am looking at the acoustic performance tool for LEED v4.

At the table for Sound transmission...

Last reply: Tracy Marquis, May 8, 2020, 12:51 pm

Number of Lux Measurements in a High Rise Office Tower

CS-v4 EQc4: Daylight
posted by Christine Recke on May 8, 2020, 8:16 am

In a Core and Shell project Office Tower that is over 50 stories, the rule is still measure all regularly occupied spaces in the building? That could mean over 50 floors of measurements?  Or is...

Last reply: Daniel Glaser, May 8, 2020, 12:09 pm

Entryway systems for delivery

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Christine Recke on Jun 24, 2019, 9:34 am

Hi everyone,

we have a project that includes a delivery entry, which is only used by the responsible service staff for the delivery operation. 

To our mind this delivery entrance is...

Last reply: Karen Joslin, May 5, 2020, 3:02 pm

LEED v4 ASHRAE 90.1 Simulation- DES Option 1, Path 3. Streamlined Modeling

NC-v4 EAp2: Minimum Energy Performance
posted by Eduardo Vidal Kume on Apr 29, 2020, 7:31 am

Hi all, 

I Would like to use LEED v4 Reference Guide District Enery System, Option 1, Path 3 "Streamlined Modeling" for a Building that has both Disctric Heating and Cooling. The building...

Outdoor ventilation rates in baseline and proposed

CS-v4 EAp2: Minimum Energy Performance
posted by Sarah Leenknegt on Apr 7, 2020, 5:45 am

Hi

Our situation is the following: the outdoor ventilation rates in the proposed building are higher than required by ASHRAE 62.1. Therefore, the baseline model will have lower outdoor...

Last reply: Tyler Thumma, Apr 15, 2020, 1:13 pm

Conservation Organization compliance for Option 2

CS-v4 SSc2: Site development - protect or restore habitat
posted by Kévin THIZY on Feb 2, 2017, 9:39 am

Hi,

In order to satisfy Option 2 - Financial support - requirements for our project (location : near Paris, France), we selected a conservation organization regionally and nationally...

Last reply: Kévin THIZY, Apr 14, 2020, 1:38 pm