Log in
Forum » NC-v4 EQp1
Topic

LEED NC (BD+C)- High Rise Residential Building- CO monitoring

NC-v4 EQp1: Minimum indoor air quality performance
posted by Srinivasan M on Oct 1, 2017, 9:46 am

Hi,

We are working on a high rise residential building, which is 100% mechanically ventillated. we have incorporated all requirements in our design to meet the...

Last reply: Asa Foss, Sep 9, 2019, 4:16 pm

Minimum IAQ Performance Calculator Summary sheet Voz

NC-v4 EQp1: Minimum indoor air quality performance
posted by Claudia Sturcz on Sep 6, 2019, 7:20 am

On the summary sheet in the last column  "n/a" data appears even if the Voz values are filled in the other sheets. We can't find the solution.  Could somebody help me?

...

Fresh Air Requirement for Dwelling Units

NC-v4 EQp1: Minimum indoor air quality performance
posted by Pan Pan on Aug 18, 2019, 10:40 am

Hi!

Can I use 62.2-2010 instead of the 62.1-2010 ventilation rate calculation procedure for dwelling units? The project is a 4-story apartment building? Thanks. Hope you can help me. 

MERV 11 in garage unit

NC-v4 EQp1: Minimum indoor air quality performance
posted by Johanna Koch on Aug 8, 2019, 3:25 am

Do you have to have...

Ventilation Requirement for High Rise Residential

NC-v4 EQp1: Minimum indoor air quality performance
posted by Jay Murray on Jul 3, 2019, 10:07 am

Question: Is it necesary to hard duct ventilation air into each bedroom within the apartment? Or...is it adequate to provide all of the required ventilation for that apartment in one location (ie...

Required spaces for IEQp1 calculator

NC-v4 EQp1: Minimum indoor air quality performance
posted by RDK E&S on Jul 2, 2019, 1:10 pm

Hello, 

I was under the assumption that the IEQp1 calculator should only include densely occupied spaces, but I'm having trouble finding any documentation around which spaces should be...

Last reply: Dave Hubka, Jul 2, 2019, 2:59 pm

Major renovation to existing building- EQp1 requirements

NC-v4 EQp1: Minimum indoor air quality performance
posted by Navisa Jain on May 23, 2019, 10:25 am

We have a 6 storey addition to an existing 4-storeyed building. The mechanical systems for the addition are separate from the existing systems. The project is going for LEED v4 CS certification...

Last reply: David Posada, May 31, 2019, 4:17 pm

Demand Control Ventilation

NC-v4 EQp1: Minimum indoor air quality performance
posted by Ricardo Sá on May 22, 2019, 7:47 am

Dear All,

I’m currently modelling a building that uses DOAs with air-side heat recovery for space ventilation in the Proposed Design. As per ASHRAE 90.1 – 2010, section 6.4.3.9...

Outdoor air monitoring- Mass balance

NC-v4 EQp1: Minimum indoor air quality performance
posted by Ricardo Sá on May 17, 2019, 6:19 am

Hi,

In what concerns outdoor airflow monitoring requirements for a...

CIBSE Narrow Plan Requirement

NC-v4 EQp1: Minimum indoor air quality performance
posted by gjn on May 9, 2019, 11:25 pm

Hello everyone,

Are there any alternatives for complying CIBSE AM10 requirement for narrow plan? Our project will have a building width that is greater than 15m by almost 4m even with the...