Topic | Recent |
---|---|
Metal stops for TilesNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Cecile de Villemeur on May 27, 2022, 12:58 pm
Hello, Do you think that metallic stops for tiles should be assessed as flooring systems for IEWc4.3 credit ? THanks ! |
|
Emergency generator buildingNC-v4 MPR2: Must use reasonable LEED boundariesposted by Priscillia Champagne on Oct 8, 2019, 1:06 am
I am starting a project in which we are building a new addition to an existing hospital which will be approx. 30 000 m2 (considered separate building from existing hospital). In the same scope of... Last reply: Priscillia Champagne, May 30, 2022, 9:07 am |
|
New addition with separate air distribution systems also feeding renovation portion of existing hospitalNC-v4 MPR2: Must use reasonable LEED boundariesposted by Priscillia Champagne on May 30, 2022, 9:02 am
We are planning to register a new project for LEED certification, but we need to make sure that we can comply with the minimum program requirement #2 beforehand. The specific language that is... |
|
Restore habitat overlap with rainwater infiltrationNC-v4 SSc2: Site development - protect or restore habitatposted by Andrea Vickers on Jun 15, 2021, 1:30 pm
I'd like your opinions on a phrase in Protect or Restore Habitat: "Project teams may exclude vegetated landscape areas that are constructed to accommodate rainwater... Last reply: Andrea Vickers, May 24, 2022, 11:45 am |
|
Open Spaces- Turf GrassSchools-NC-v4.1 SSc3: Open spaceposted by Michael J Turner on May 19, 2022, 11:02 am
Hi there, Does LEED turf count as the vegetation of outdoor space credit for Schools LEED V4.1 ? Many thanks, |
|
Distance to the access point within the limit or notHealthcare-v4 SSc7: Places of respiteposted by Priscillia Champagne on May 11, 2022, 4:14 pm
Hi, We have an expansion project with operating room, offices, cleaning space for the entire hospital. We would like to install a respite area for visitors (companions) and day patients of this... |
|
PBT Source Reduction Calculator sill required for all LED lighting?Healthcare-v4 MRp3: PBT source reduction - mercuryposted by Rebecca Mann on Jan 7, 2021, 6:57 pm
Our healthcare project is a new build, and will specify all LED light fixtures. No fixtures contain mercury. To meet the requirements for the PBT Source Reduction prerequisite and ccredit, are we... Last reply: Tyler Fenton, Apr 29, 2022, 11:29 am |
|
Furniture and Medical Furnishing (product sourced-160Km)Healthcare-v4.1 MRc7: Furniture and medical furnishingsposted by Maria Kordjamshidi on Apr 6, 2022, 3:29 pm
I am woundring if the product sourced is not in 160 km of the project, no point will be assigned to the project from MRC7? |
|
Sustainability Advisor- Vancouver, BC, CanadaHelp Wanted: LEED-related Jobsposted by Jason Packer on Mar 8, 2022, 6:10 pm
Job Description: The primary focus of this position is to manage and/or assist on high performance green buildings that have identified sustainability targets such as LEED, Step Code,... Last reply: Jason Packer, Apr 6, 2022, 4:26 pm |
|
Sustainability Analysts- Western CanadaHelp Wanted: LEED-related Jobsposted by Megan Leslie on Mar 22, 2022, 7:03 pm
Stantec's Western Canada Carbon Impact Team currently has two postings for Sustainability Analysts in Western Canada. ... |