Incomplete spaces for solar panel and future process loadNC-2009 EAp2: Minimum Energy Performanceposted by Hanh Truong on Jul 9, 2017, 10:53 pm
Dear Sir, I am working on factory project which targets to reach a LEED 2009 certified level. The... Last reply: Hanh Truong, Jul 10, 2017, 10:32 pm |
|
Controllability of lighting in Shared AreaNC-2009 IEQc6.1: Controllability of systems - lightingposted by Jonathan Mak on Jun 18, 2017, 10:33 pm
We are having a hotel project that would like to attempt this credit. all the guestroom will have individual control to suit the occupant's needs. Last reply: Jens Apel, Jun 22, 2017, 2:14 am |
|
Energy Simulation BaselineCS-2009 EAc1: Optimize Energy Performanceposted by Yong Lee Low on Apr 24, 2017, 10:51 am
Hi, I am working on a office building of about 15,000sqm using... Last reply: Marcus Sheffer, May 30, 2017, 8:56 am |
|
Factory with a high unregulated energy loads- LEED EAp2NC-2009 EAp2: Minimum Energy Performanceposted by Hanh Truong on Apr 5, 2017, 5:54 am
Hello, I am a beginner in LEED. I have a question regarding to EAp2. I am recently preparing LEED certificate report for a factory. However, I get a problem in achieving Minimum Energy... Last reply: Marcus Sheffer, Apr 7, 2017, 9:29 am |
|
Local Code RequirementCS-2009 EAp2: Minimum Energy Performanceposted by Yong Lee Low on Mar 29, 2017, 12:24 pm
LEED indicates that "Projects outside the U.S. may use an alternative standard to ANSI/ASHRAE/IESNA Standard 90.1‐2007 if it is approved by USGBC as an equivalent standard". If a office... Last reply: Marcus Sheffer, Mar 30, 2017, 9:34 am |
|
Finished surface of structural wall?NC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Erin Holdenried on Feb 22, 2017, 2:41 pm
Hi. Does one include the finished surface (such as tile, or painted GWB) applied to or furred out from a structural wall in this credit? Thanks! Last reply: Tristan Roberts, Mar 22, 2017, 11:46 am |
|
Exterior windows and doors?NC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Erin Holdenried on Feb 22, 2017, 4:49 pm
I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1? Last reply: Tristan Roberts, Feb 23, 2017, 9:50 am |
|
Painting/coating in tenant spaceCS-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Indochine Engineering VN on Mar 3, 2016, 10:32 pm
Hi, My project is a mixed use building with 2 floor on the top for apartments. building developer design interior fit out in all apartment for lease. My understanding is with LEED CS, we don't... Last reply: Tristan Roberts, Jan 19, 2017, 5:50 am |
|
Lighting control for Meeting roomNC-2009 IEQc6.1: Controllability of systems - lightingposted by Thanh Le on Dec 5, 2016, 2:49 am
If a meeting room is designed with occupany sensor and manual override, does it comply with this credit. If it does not comply, how do we do to comply with this credit. Last reply: Nadav Malin, Jan 10, 2017, 3:15 pm |
|
Water Fountains in an Urban SettingNC-2009 SSc5.2: Site development - maximize open spaceposted by Doug Snyder on Sep 20, 2016, 10:58 pm
We have a tower project in SE Asia that will have several decorative water fountains. The slopes will not be vegetated or of a gradual nature, but it seems these should still count as open space... Last reply: James Wilson, Jan 8, 2017, 11:33 am |