ACP- No Cooling Tower (Core & Shell v4)

CS-v4 WEc3: Cooling tower water use
posted by Anke Koch on Dec 12, 2017, 3:38 am

(https://leeduser.buildinggreen.com/forum/acp-no-cooling-tower-core-shell-v4) also confirms my understanding of the interpretation. Log in or register to post comments ...

Last reply: Erkki Seinre, Aug 6, 2020, 9:13 am

LEED online Substitution v4.1 for v4 MRC1: Submit 4 Points for Option 4 Path 4?

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by J Schütz on Mar 20, 2020, 9:02 am

Dear all,

as our project meets the requirements of Path 4, we like to submit 4 Points in LEED online. For Option 4 under LEED v4 only 3 Points are available at the thresholds. Is it...

Last reply: J Schütz, Aug 5, 2020, 1:49 am

Has anybody used microlouvers already?

NC-v4 EQc6: Interior lighting
posted by Pierre-Antoine Legrand on Jul 30, 2020, 5:12 am

I am trying to figure out how to integrate microlouvers in a double-skin façade.

The architect has decided that only 50% of the louvers would be operated by the user...

Does...

Tolerance within the achievement of criterias due to different affectations

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Audrey LEDESERT on Jun 18, 2020, 4:37 am

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up July 21, 2020- 9:14 pm Audrey, this will be determined for each individual credit. I would suggest reviewing the credit language for the specific questions you have, and posting your questions to the specific LEEDuser forum for that credit. Log in or register to post comments ...

Last reply: Tristan Roberts, Jul 21, 2020, 9:14 pm

Indoor Air Measurements: required measurement duration

EBOM-v4.1 EQp4: Indoor Environmental Quality Performance
posted by Roland Braun on Jun 26, 2020, 5:33 am

Hi to all:
We carry out indoor air measurements throughout Germany, including also for Leed certifications (so far Leed v3). Now I have a request for measurements according to Leed v4.1. A...

Last reply: Roland Braun, Jun 30, 2020, 2:19 pm

CxA: independance of the design team

NC-v4 EAc1: Enhanced Commissioning
posted by Audrey LEDESERT on Jun 25, 2020, 5:08 am

In our office, we have 2 separate departments : one that works in building technicals (HVAC/San) and the 2nd that make consulting.

The consulting department is in charge of LEED...

Last reply: Marcus Sheffer, Jun 25, 2020, 9:06 am

Baseline parking for a DATACENTER

CS-v4 LTc7: Reduced parking footprint
posted by Marion THIBAULT on Jun 23, 2020, 12:11 pm

Hi everyone,

I'm working on a DATACENTER project, and I can't find the baseline parking capacity for this type of building. It is not included in the "TABLE 1 - Base Ratios for parking...

how is considered Paris’ tramway?

NC-v4 LTc5: Access to quality transit
posted by Marion THIBAULT on Jun 23, 2020, 11:49 am

Hi everyone,

I have some trouble to determine if the Paris’ tramway corresponds to a...

Option 2- Strategy F: work surfaces comply but no movable partitions in the project

NC-v4 EQc6: Interior lighting
posted by Benjamin Weise on Feb 19, 2020, 2:39 am

We are planning to comply with the strategies A, B, C and F. The strategies A, B and C should not pose a problem. However, I am not sure about strategy F:

Work surfaces will be grey-white...

Last reply: Kera Lagios, Jun 22, 2020, 9:32 pm

Is tehre a reference as to which costs are to be considered?

NC-v4.1 MRc3: Sourcing of Raw Materials
posted by Benjamin Weise on Mar 23, 2020, 3:39 am

Hi,

this question is about a project in Germany, so cost estimates might work differently here. We are having difficulties retrieving the material costs from the subcontractors.

The...

Last reply: Shawn Keith, Jun 4, 2020, 3:27 pm